ORDINARY MEETING AGENDA                                                            18 JUNE 2020


        Building Height
        3 4. The maximum height of the development must not exceed the maximum height as
             reflected in the approved plans with respect with the finished ground level and the
             natural ground level.
        Access and Parking
        4 5. No parking is allowed on the driveway of the adjacent Noosa River Holiday Park
             site.
        Building Appearance
        5 6. The development must be finished with subdued/muted external building colours,
             as shown on the approval plans.
        6. 7 Roof materials must be non-reflective to minimise the visual impact of the
             development.
        7 8. Any fencing must be designed and be of a colour that blends with the environment
             and complements the building design.
        8 9. Any waste bins or air conditioning units must be suitably screened so they are not
             visible externally to the site.
        Lighting
        9 10. External light sources utilised on site are limited to an external light outside the
              front door of the facility and a single dock light, used for a maximum for 30 minutes
              during operation start and finish times outside of daylight hours.
        Stormwater
        10 11.    All stormwater run-off from the new works is to be connected to the existing
             on-site drainage system.
        DEMOLITION
        Works
        11 12.    Any demolition works must be undertaken in a manner that causes no
             detrimental effect upon the amenity of the neighbourhood by reason of the creation
             of excessive noise, lighting, air-borne hazards, atmospheric pollutants (including
             dust or odours) nuisance or any other emissions in accordance with the nuisance
             provisions of the Environmental Protection Act 1994.
        Waste management
        12 13.   A Waste Management Plan (demolition) must be submitted in accordance with
             Planning Scheme Policy 11 - Waste Management Plan and approved by Council’s
             Waste Coordinator prior to issue of a development permit for Building Works for
             demolition, removal or relocation.
              The purpose of the Waste Management Plan is to facilitate the segregation of
              waste for the effective reuse and recycling of such materials. Segregated wastes
              attract significantly reduced disposal fees at the landfill with some items free.
              Higher gate fees are charged for mixed waste.
              Waste storage areas must provide for adequate separation of all reusable,
              recyclable and waste materials. These must be located so that they are convenient
              and safe to use.
              The Plan must contain the following information:
              a.    The areas for the storage and separation of waste shown on a site plan;



                                                                                   Page 11 of 26
Log in to download the original file

2020-06-18 Ordinary Meeting Agenda(PDF, 959KB).pdf · 982 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.