ORDINARY MEETING AGENDA 18 JUNE 2020
b. A waste management table as indicated below is to be completed showing
how waste material is to be segregated - recycled – reused or disposed; and
c. Table – Waste Management Table
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor contractor and
re-use or on-site and recycling landfill site or
recycling methods outlet other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table
is to be completed by the demolition contractor.
Damage to infrastructure
13 14. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-existing
conditions.
Litter, erosion and sediment control
14 15. Litter, erosion and sediment control measures must be installed and
maintained until soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or
storm water drainage system (e.g. roadside gutter).
Landscaping Works
17 16. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that
specific area and must include in particular:
a) the works shown on the Approved Landscape Plans (as amended); and
b) the removal of the existing Cocos Palm, and the planting of Archontophoenix
cunninghamiana (Bangalow Palm) either 200L or ex-ground, and guyed
(staked) sufficiently in accordance with horticultural standards; and
bc) dense landscaping to screen the bulk and scale of buildings from residences
on Russell Street and the Noosa River Holiday Park.
18 17. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Page 12 of 26