Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2015-09-15 Planning & Organisation Committee Agenda

of 168

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           15 SEPTEMBER 2015




                Figure 11 – New Entrance Canopies to Existing Shopping Centre

No significant upgrades to the external road network are proposed, however, the applicant
indicates two external intersections will require upgrades within a 10 year horizon, being Eumundi-
Noosa Road/Beckmans Road and Eumundi-Noosa Road/Eenie Creek Road. The applicant
submits standard development contributions will cover the former and an additional contribution
should be apportioned toward the latter.

The application includes operational works components relating to vegetation removal and
earthworks within a Coastal Management district. Both components are directly associated with
the shopping centre expansion and have been included with the initial application to provide the
applicant with certainty regarding these particular operational works aspects.

1.1 Supporting Documents
The application material includes extensive specialist reports and supporting documents,
comprising:
   Town Planning Report prepared by Cardno HRP
   Architectural Drawings and Architectural Design Report prepared by The Buchan Group
   Landscape Concept prepared by Cardno
   Traffic Impact Assessment prepared by Cardno
   Engineering Report prepared by Cardno
   State and Local Government Ecological Assessment prepared by Cardno
   Covenant Interface Management Plan prepared by Cardno
   Bushfire Assessment Report prepared by Cardno
   Visual Amenity/Landscape Integration Report prepared by Cardno
   Retail Needs Assessment prepared by Urbis
   Commercial Needs Assessment prepared by Urbis
   Commercial Office Scenario and Supporting Strategies prepared by The Buchan Group
   Arbour Architectural Drawings prepared by Bark Design




                                                                                   Page 73 of 189
Log in to download the original file

2015-09-15 Planning & Organisation Committee Agenda(PDF, 5MB).pdf · 5.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.