SUPERSEDED SPA Decision Notice - 010.2010.00000871.001 [As Published] · 132010.871
2010/871
11.2. The retention of two Pandanus and two Cabbage Palms within the Pandanus Street
Frontage.
11.3. Native screening vegetation provided within garden beds with a minimum of 500mm
width along the southern boundary. Note that this will require the relocation of the bin
storage areas and may affect the vehicle manoeuvring areas;
11.4. Removal and revegetation of the redundant driveway to the Pandanus Street frontage
of the site.
12. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
must be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement must
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing must be provided around the trees during construction to help protect them.
Plans must be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
13. Where retained trees are located in areas which are to be filled on site (or are located on
neighbouring allotments to the actual site to be filled), there shall be no fill material placed on
the trees root system. To this end the design of the filling works will need to incorporate
terracing around the tree or a similar means of ensuring that the natural ground level around
the trees remains generally the same as existing. These measures must clearly be shown on
the plans submitted for Operational Works approval and any drainage required to drain these
areas must also be shown on the plans.
14. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
14.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps;
14.2. Disposal for firewood;
14.3. Disposal for landscaping purposes;
14.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose; and
14.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are submitted.
Fencing
15. Front fences and walls are to be setback an average of 1 metre, which is articulated to provide
visual interest by stepping the design at maximum 5m intervals. The area of land between the
fence and the front property boundary shall be densely landscaped to screen any fencing from
the street.
Waste Management
16. Where the development involves the removal, relocation or demolition of a building, a Waste
Management Plan (construction and demolition) shall be submitted and approved by Council’s
Waste Management Section prior to issue of a development permit for operational works for
demolition, removal or relocation of any building other than a shed.
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Page 3 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED SPA Decision Notice - 010.2010.00000871.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 859 KB (small file)
- File type
No other editions are linked here.