SUPERSEDED Negotiated Decision Notice - 010.2010.00000811.001 [As Published] · 132010.811
2010/811
4 ASSESSMENT MANAGER CONDITIONS
Planning Assessment
General
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and as
amended by these conditions.
Plan / Document No. Issue. Plan / Document Name Date
0912 - CD 1.01 P6 Site Plan Ground Floor – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 0.04 P2 Easements – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 3.01 P5 Site 22 Ground Floor Plan – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 3.02 P5 Site 22 First Floor Plan – Middap Ditchfield 2 June 2010
Pty Ltd
0912 - CD 3.03 P3 Site 22 Roof Plan – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.01 P3 East Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.02 P3 West Elevation – Middap Ditchfield Pty Ltd 2 June 2010
0912 - CD 4.03 P3 South & North Elevation – Middap Ditchfield 2 June 2010
Pty Ltd
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
4. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this
approval to effect compliance with conditions.
5. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
6. The Development Permit for a material change of use lapses if the use has not happened by
25 October 2014, unless an application to extend the currency is approved by Council.
Building Design
7. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate
lodged with Council at completion of work confirming compliance with the maximum allowable
building height of 8.0 metres, measures from existing and finished ground level.
8. Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus
remaining as open structures.
9. External colours and finishes of the building shall comprise muted/environmental tones that
blend with the natural environment.
10. Mechanical plant and equipment including pool and spa pumps, pool heaters, air conditioning
units and refrigeration units shall be screened by fencing or with dense vegetation 1.5 metres in
height. These shall be visually integrated into the line of the building and roof design and do not
Page 2 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2010.00000811.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 295 KB (small file)
- File type
No other editions are linked here.