Council archive · source document
001AD296.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklrst, Version 22
, : Tecton | tustoe completed for al apchications tnat require oommeton of ine (GAS Assessme™ Speceat
I eee
ke } we _ _ |
1.1A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Goto178 (_] Yes
a ep ee ed Pe +
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
XJ No-Gotoqi2 [_] Yes
Bea drt tp ET Rabe sen 2A TER guide ae Sehadat pert 2 lapki MF
ber Ye Fe oO Tm wrens nee eae
ome - rr e-em rr eS - s | Pr kre ee ES ee EE EE TE ES = ve eee
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No-Gotoar3 [_] Yes
'PA schedule 8 part 1, lehve 5 tem 1 IP Reguiatian, schedule 2 tabie 2. tem 11 IP Roguiaton schedule 7. tate 5, tem 2 (wid river ote aj, Water Act 2990,
e section BBL; Wild Rivers Act 2005, section 44A
pe mare eee ane ee me ae mei ne ea nme memes ae ee RTE ee a em
Rover bteear ORE RNAI Suge lakh Wee Ran "
- ew ee re rere ee LE RE Te TS * Ls ee -
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJ No-Gowoar4 [_] Yes
IPA weheduie sd gant i tabs 2 cee TPA scnadey tpt taj & Doms Pend 472 Regu! tea sotertde 2 taped (eats Vand 72 Envi sth Dre chen Bet TM ay chan
IAA fe deer oe Ad owers Act ZUPA, seria 4440 relee ante: Sy tive dectaranen Wud Rivers Doge
Rape ee TET AREER ” , “ a
1.4 ts any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
{X] No - Got0.Q15
[_] Yes
IP Reguleton, schedule 2, table 2, tems 14 and 16
Ligsieg Ten wae * cae ra em
cea rem a ve A a a ET me i
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[XJ No - Goto 076
@ CI Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
iP Reguistion, schedulz 2, table 2, tem 26
he Oo bee ER Ll , poms mem ee eee '
16 {s any part of the premises designated for community infrastructure?
No - Go to Q1.7
(1 Yes
IP Requiaton, schedur 2. table 3, tem 7
Fees ee ER a , . 7 soe
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No - End of Section 1 L] Yes
IP Reguiiter, Sheds 7. tela 2 dem fSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AD296.001.pdfRelated documentPublic source context ↗
09/0730 - Operational Works - (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.