The Year in Review
This section of the Annual Report looks at Council’s progress in achieving the goals set out in its
Corporate Plan. Noosa Council adopted a new Corporate Plan in January 2017. The Corporate Plan
identifies five themes, a series of long term goals and key focus areas for 2017-2022. Council’s
progress towards achieving them are set out below.
Council’s Operational Plan 2016/17 detailed the major priorities and initiatives that Council undertook to
work towards the implementation of the Corporate Plan. Throughout the year, the CEO provided
Council with quarterly reports looking at progress of the Operational Plan and details of Key
Performance Indicators. The CEO also provided a separate report at the end of the financial year to the
Council on the progress towards achieving the Corporate Plan outcomes. Both the quarterly and annual
reports to Council are made available to the public via Council’s website.
Corporate Plan Theme 1: The Noosa Environment
“Our environment is protected, enhanced and valued by the community”
Key achievements as we work towards our long term goal include:
Council committed to a three-year agreement the energy use of 9 of Council’s largest energy
to remain part of the Healthy Waterways producing sites to identify which energy
Program. efficiency projects should be undertaken in the
Council reviewed its management approach to first instance to both reduce costs and
the Noosa River and has committed to refresh emissions.
and rewrite the Noosa River Plan with an Council adopted a new street sweeping
expanded focus on river catchment areas. The contract which has resulted in an increased
revised Noosa River Plan is currently being length of roads being serviced by the street
drafted. sweeper. This reduces the amount of rubbish
Council adopted the Noosa Shire Koala going into drains and waterways.
Conservation Plan in July 2016. Actions to Stage 2 of the Munna Point foreshore
implement the Plan are now being progressed. revitalisation project has been implemented
Council undertook an audit of waste water with the aim of reducing environmental damage
facilities in Cooran. Cooran is not serviced by a to Munna Point from erosion.
sewerage system and accordingly, residential In December 2016, Council adopted the Noosa
properties use on site waste water facilities and Biodiversity Assessment Report. This report is
an audit was undertaken to determine the level an important input into our Council’s new
of compliance from an environmental protection Planning Scheme and also acts as a
and health perspective. benchmark for future assessment of
Council adopted the Noosa Parklands Park biodiversity across the Shire. The report will
Management Plan following significant also be useful as part of the 10 year renewal
consultation with local residents. Staff are application for the Noosa Biosphere Reserve.
currently working to develop a suite of other Council awarded a new waste management
management plans for other bushland reserve contract to Cleanaway for the period 2017 -
areas within the Shire. Those plans are 2024 at an approximate cost of $46 million.
substantially complete. This contract covers the collection, disposal
Council made a submission to the State and recycling operations for the Eumundi Road
government on the green paper on Fisheries Waste Recovery Centre and includes the
Management Reform. Council has also made a introduction of a green waste recycling bin
number of direct representations to the Minister which will reduce green waste being buried in
on this topic. the landfill, thus significantly reducing methane
gas.
Council has adopted its Zero Emissions
Strategy focused on eliminating our Council was successful in receiving a grant
organisation’s emissions by 2026. This was a (managed by the Local Government
major initiative of Mayor Wellington and work Association of Queensland) for the
has been undertaken in 2016/17 to establish development of a Coastal Hazard Adaption
the baseline level of emissions (which have Plan. A Project Officer has been appointed and
been recently re-calculated). A major report has work is currently underway to develop both a
been finalised on Coastal Hazard Adaption Plan (year one) and a
Noosa Council | Annual Report 2016 - 2017
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.