6.4 MECHANICAL PLANT NOISE LEVELS In order to achieve compliance with the continuous noise criteria outlined in Table 1, the operational conditions must follow the recommendations in Section 5. a) ) ; i Va. fa ‘ays eo) “i 7 Mech. plant deck Exhaust/Mech. plant AL fl / nea > aS J Mech Plant Adjacent to Loading Docks Mech Plant Adjacent to Loading Docks Figure 20- Mechanical Plant Locations I\Mobs\2019\20191414\20191414.2\202009030BA_R4_Noise_Impact_Assessment.docx 27