Request for Further Information - 010.2007.00001259.001 [As Published] · 132007.1259
24. Dimensioned, scaled drawings (of a larger size eg A2 or A1) of the car parking
areas; internal roads and circulation areas to demonstrate compliance with
AS2890, including cars and trucks manoeuvring patterns for spaces, aisles and
loading bays; proposed bike racks (for employees and short term public users)
and end-trip facilities.
25. A pedestrian traffic management plan is required for the site, particularly in
respect of pedestrian traffic movements through the car park areas.
26. The proposed development can be expected to significantly increase usage of
the existing pedestrian crossing of David Low Way adjacent to the site. The
impact of this increased usage on queues in David Low Way should be assessed
for the three inter-related traffic features - roundabout, pedestrian crossing and T-
junction.
27. Further details should be provided of bus parking facilities, particularly in view of
the proposal to attract back-packer bus tour custom.
Stormwater Quality Management Assessment
28. Please provide a comment from an ecologist that gives reasons to support the
methodology of using Maroochy Load Reduction Targets instead of assessing
the downstream ecosystem and its sensitivity of the low nutrient environment
heathlands to nutrients and other pollutants to determine appropriate water
quality objectives. If required please provide reviewed modelling and treatment
train to achieve the new Water Quality parameters. See further detail of the
issues here:
28.1. The submitted assessment report has neglected the concentration based
WQO with an argument which suggests that the existing site being "not in a
natural 'undeveloped' condition" and therefore does not need to meet the
concentration based WQO (Browns report, pg 5). There are concerns with
neglecting concentrations all together and the fact that the mitigated
concentrations expected using MUSIC gives values 3.5 times the allowable
value for total nitrogen given in South East Queensland Water Quality
Guidelines (2006) and would almost be 3 times higher than those
acceptable in Brisbane City. The appropriate WQO for nitrogen is 0.5mg/L
normally, but lower for a low nutrient heathland environment.
28.2. In regards to the music model there is no information as to the pollutant
removal efficiencies of the selected treatment devices such as the C* value.
This is needed to determine if modelling of an ephemeral wetland is
appropriate. The wetland itself would probably be very ephemeral as its
catchments draining to it are very small and it is questioned whether or not
it is fair to model as a wetland and whether wetland plant species would be
supported.
28.3. The Music model has been based on BCC 2003 guidelines because there
are no MUSIC guidelines for Noosa available. The question is, why has the
more recent GCCC 2006 guidelines been neglected when they are the only
available guidelines which prescribe pollutant generation rates for roads,
roofs and other areas which is how this particular model has been
delineated.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00001259.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.