29. Provide an ecologist’s assessment demonstrating that the proposed stormwater
treatment train and measures will protect the natural ecosystem downstream of
the development site.
30. In relation to the stormwater tank re-use methodology, table 4.6 should show that
the reuse connections for buildings A1, A2, B1, B2, B3, and C1 should be to
toilets, swimming pool topping and irrigation and for the beach shacks for toilets
and irrigation also. Please provide amended results with this in mind.
31. It seems as that the annual runoff rates have been used in the tank balance
model and not actual daily data. Considering the small size of the tanks there is
probably a lot of overtopping in the larger events that would lead to water being
lost to the system. There are probably long periods of time when the tanks are
empty for example the beach shack tanks are only 3kL and have a re-use of
210L/day meaning there is only 14 days supply in each tank. More information is
required to support the water balance model.
32. Justification of the assumption that rooftops will have 100% of the area drain to
the tank. The report states that the pipes will be positioned to collect all the runoff
but no details are provided and this may not be practical. The available
stormwater industry guidelines indicate only 70% effective capture for rainwater
tanks without detailed design of roof pitches coupled with simultaneous wind and
rain data.
33. Explain why the overflow from the rainwater tanks (uncontaminated) is required
to be directed through the wetlands.
34. Please provide a more detailed plan/s of the proposed stormwater system
including (but not limited to) the layout and grades of stormwater pipelines and
outlet/s, the location of the treatment devices and their sizing.
35. Information regarding any existing stormwater systems to be removed or
replaced particularly at the outlets and the location and type of proposed outlets.
Sewer Mains
36. Provide the general sewer layout plan on the development site taking into
consideration that no building or other structure requiring building permit will be
allowed within the zone of influence of the sewer main. Sewer easements of
minimum width of 3m in favour of Council in accordance the requirements of
Planning Scheme Policy 6 – Water & Sewerage Design Standards will be
required on all new sewer mains.
37. It should noted that a new sewer to service existing connection to Lot 51
SP156203, No.221 David Low Way (Peregian Hotel site) should be constructed
along and within the northern and eastern boundary of the proposed
development site to a point adjacent to Council sewer manhole MP20/02/09.
Connection to be made to existing manhole by contractor approved by Noosa
Shire Council.
General
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00001259.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 25 KB (small file)
- File type
No other editions are linked here.