Attached to the e-mail Change to existing approval MCU15/0111.01.
8.7 Landscaping treatments to open space areas associated with Stage 1a including the
establishment and rehabilitation of all detention basins, the establishment of landscaping
buffers to site boundaries and adjoining residential properties and street trees.
APPLICANTS JUSTIFICATION
It is acknowledged that a Condition can state that a development may not commence (use) until other
development permits or works are completed. Nonetheless, it is important to understand the practicality of
actually completing the full quantum of works at the first stage of a development.
SUB-CONDITION COMMENT
All roadworks on the Main Road of Cooroy - This is a concurrence agency matter and does
Connection Road not fall within the proper jurisdictional limits of
Noosa Council functions under the Sustainable
Planning Act 2009 and Sustainable Planning
Regulation 2009. Nevertheless, you are advised
that on the 12 October 2016 an application was
lodged with Main Roads.
- Mains Roads have not conditioned the timing of
the road upgrade as there is sufficient capacity
in the road network.
All frontage works including footpaths and - Council has not considered the logical sequence
landscaping for Trading Post Road, Pearson Road of construction whatsoever. Major service
and Elm Street as required by conditions of this infrastructure such as high voltage cable,
approval. stormwater, sewer and streetlights are required
in the road reserve prior to the footpath being
constructed. If the footpath is installed, it will be
either damaged or have to be cut out to make
way for the services.
Bus shelters. - As mentioned above the application to Main
Roads for the bus shelters is afoot. Nevertheless
Palm Lake provides a twice daily bus service for
residents to take local shopping trips.
A pedestrian refuge crossing and lighting associated - The following is still required to be completed
with the bus stop pair on Elm Street. for the lighting design:
o Analysis of existing lighting in street
o Review of existing lighting and
assessment of compliance with
AS/NZS1158
o Design of lighting to AS/NZS1158
o Design of pedestrian crossing lighting to
AS/NZS1158
o Design of reticulation to supply new
lights
o RPEQ certification
o Obtaining council & DTMR approvals
Page 3 of 5
Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 703 KB (small file)
- File type
No other editions are linked here.