Planning Report · MCU15/0111.01

Attached to the e-mail Change to existing approval MCU15/0111.01.

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                                                               o    Production of isolux plans and
                                                                                    certificate of compliance
                                                                               o    Liaison with council, DTMR and
                                                                                    Energex, arranging Public Lighting
                                                                                    Supply Agreement
                                                                               o    Obtaining       details     of   existing
                                                                                    underground services for coordination
                                                                                    purposes
                                                                               o    Obtaining details of existing electricity
                                                                                    infrastructure
                                                                               o    Voltage drop and fault loop
                                                                                    calculations, as required
                                                                               o    Preparation of CAD drawings, including
                                                                                    schematics, equipment, civil and cable
                                                                                    schedules (preliminary and detailed
                                                                                    final)
                                                                               o    Preparation      of     lighting  design
                                                                                    certification drawings.
                                                                     -
 All fencing to Trading Post Road and Pearson Road,                  -    The fence will cause serious conflict with service
 and all acoustic fencing to Elm Street as required by                    installation.
 the approved Acoustic Report.
 Landscaping treatments to open space areas                          -    The Basins must remain as sediment and
 associated with Stage 1a including the establishment                     erosion control devices until 80% of the
 and rehabilitation of all detention basins, the                          development is complete. Please refer to
 establishment of landscaping buffers to site                             Condition 67.
 boundaries and adjoining residential properties and                 -    Landscaping will be completed in areas where
 street trees.                                                            construction is finalised.

The following table further identifies Conditions referencing Stage 1a.

 CONDITION REFERENCING STAGE 1A                                     COMMENT
 23, 25, 27, 29, 31, 36, 38 and 41                                  For the reasons made above. Amened Conditions to
                                                                    show Stage 2

ASESSMENT OF CHANGES – SECTION 367 - SUSTAINABLE PLANNING ACT 2009

The following table uses the St ate Guideline to provide an assessment against those circumstances that a
proposed change may result in a substantially different development.

 CIRCUMSTANCE                                                       COMMENT
 Involves a new use with different or additional                    No new uses are proposed.
 impacts.
 Results in the application applying to a new parcel                No new land is included.
 of land.
 Dramatically changes the built form in terms of                    No changes to the built form are proposed
 scale, bulk and appearance.


                                                                                                                          Page 4 of 5
        Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
                           P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au
                      Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119

Used in these records

About this file

File size
703 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Planning Report.pdf · 703 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.