Planning Report · MCU15/0111.01
Attached to the e-mail Change to existing approval MCU15/0111.01.
o Production of isolux plans and
certificate of compliance
o Liaison with council, DTMR and
Energex, arranging Public Lighting
Supply Agreement
o Obtaining details of existing
underground services for coordination
purposes
o Obtaining details of existing electricity
infrastructure
o Voltage drop and fault loop
calculations, as required
o Preparation of CAD drawings, including
schematics, equipment, civil and cable
schedules (preliminary and detailed
final)
o Preparation of lighting design
certification drawings.
-
All fencing to Trading Post Road and Pearson Road, - The fence will cause serious conflict with service
and all acoustic fencing to Elm Street as required by installation.
the approved Acoustic Report.
Landscaping treatments to open space areas - The Basins must remain as sediment and
associated with Stage 1a including the establishment erosion control devices until 80% of the
and rehabilitation of all detention basins, the development is complete. Please refer to
establishment of landscaping buffers to site Condition 67.
boundaries and adjoining residential properties and - Landscaping will be completed in areas where
street trees. construction is finalised.
The following table further identifies Conditions referencing Stage 1a.
CONDITION REFERENCING STAGE 1A COMMENT
23, 25, 27, 29, 31, 36, 38 and 41 For the reasons made above. Amened Conditions to
show Stage 2
ASESSMENT OF CHANGES – SECTION 367 - SUSTAINABLE PLANNING ACT 2009
The following table uses the St ate Guideline to provide an assessment against those circumstances that a
proposed change may result in a substantially different development.
CIRCUMSTANCE COMMENT
Involves a new use with different or additional No new uses are proposed.
impacts.
Results in the application applying to a new parcel No new land is included.
of land.
Dramatically changes the built form in terms of No changes to the built form are proposed
scale, bulk and appearance.
Page 4 of 5
Palm Lake Works | Southport Central Tower 3, 9 Lawson Street, Southport QLD 4215 | PO Box 10479, Southport BC QLD 4215
P (07) 5552 1300 | W www.PalmLakeResort.com.au | W www.PalmLakeCare.com.au
Palmlake Works Pty Ltd trading as Palm Lake Works | ACN 095 986 119 | ABN 14 095 986 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 703 KB (small file)
- File type
No other editions are linked here.