07/0465 - Modification to Alternative Siting Provisions [As Published] · 132007.466
*
INTEGRATED PLANNING ACT 1997,
‘SEQ Regional Plan
Fox more intrmaan refer ta schoche 2 0f Be LP
Reazion
Rafat to Chapler 2, past SA and schedule 10 of
Unlose you snewered “hone of the above" to 020,
(be applcalicn requires aseowsrnect by bre Ofc of
‘Urban Mannaement fOUM],
Fisheries matters
Fer morw inforaafon rear a achodde 2ol tha P
Reguigton,
Unkbes you armarrad ‘hone of te above" to 221,
tha application reqies anecsorgat by he
‘
(PEA).
mm agpocy char han DPISF i tho asseesston!
nenegps or the agphcabon, OP isa cancurtance|
“agency fer the agpcaicn in retaon fo as @)—
(¥) and an advice agency i retion to dem V7}.
SDAS. Chackkst, Version 18.0, 10 November 2006
20. The application involves (tick appfcable boxes) -
1 @ amiatesiat change of use of premises -
{@)_ ina Major Development Area in the Urban Footprint for -
O @ anusban activity -
(1 in anarea included in a structure plan where the IPA, section 3.1.6
applies;
(Dinan area not included in a structure plan where -
. the PA secon 3.16 apples to he appicabon fr the mara change
se; or
the premises exceeds 10,000m2; or
» the gross floor area {GFA} on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme
(O {ij intensive anima! husbandry, or
CO fii) residential development involving a rurat residential purpose
{b) in the Regiona! Landscape and Rural Production Area for -
0 @ anurban activity and not specified in section 2.4(2); or
(1 @ _ resiential development involving a rural residential purpose and not
specified in section 2,6(2)
(©) in the Rural Living Area tor an urban activity and not specified in section 2.8(2};
(d) in the Investigation Area for -
0 @ anurban activity and not specified in section 2.10{2);
CO @ residential development involving a rural residential purpose and nol
Specified in section 2.12{2); or
(i) intensive enimat husbandry
[1 @ reconfiguring a iot-
On land in a Major Development Area in the Urban Footprint that is:
{@)_ not included in a structure pian; and
{0} not specified in section 3.1(2).
& Gil) none of the above
21. The application involves: (tex the applicable boxes)
(1) anassessable material change of use for aquaculture - complete Part Or of Fam 1;
(qi) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Qs of Form 1;
(7 Gi) assessable operational work completely or partly within a declared fish habitat area-
complete Part Or of Form f;
1 @) assessable operational work that is the removal, destruction or damage of a marina
Plant - complete Part O2 of Fon 1;
[2 ) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
EX (vi) none of the above.
Page?
INTEGRATED PLANNING ACT 1997
integration of land use and public
transport
For mors information colar to Guida 23, schedule GA
of a PA, Sechadsl 2 of the {P Ragusbon.
Udeon you canwered “none ol he above’. ie
apphcabon biggers caked tb QT as a concurrence
agency.
Railway safety and efficiency
For more information refer io Guide 23, chock 6A
of he BA & schedule 2 cl he BP Roatan.
Usdoss yoo answered ‘acne of fi abowe", Se
applcaion tigger rafaral OT as aconcurrance
amy.
Woonie to Brisbane pipeline
For rocreinorteaon cat to schedule 2of he
Reguston
Unies you anewerad “hone of ho above, the
application tigger referral to he holder of pipeline
ficence Ho 1 emued undes tha Petioteunt Act 1923,
carry Santas ONT Pty Ld for achion.
IDAS Assessmend Checklist, Version 18.0, 10 November 2006
22. The application invotves: (ick the anpicable baxfes}—
1 @) a material change of use assessable against the planning scheme for a purpase
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
DA) reconfiguring a tot—
(1t@)__ontand thats completely or partly within a public transpart corridor, and the
total number of lots increases;
(1b) on land that is completely or partly within a future public transport corridor or
an airport's pubile safety area;
(1 {c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater,
(10) fora residential purpose within the 25 ANEF contour for an airport;
O€) fora residential purpose resulting in 100 or more alloiments.
LO Gil operationat work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (if)
above, an tand that—
(1) is compietely or party within a pubiic transport comidor or a future public
transport corridor,
~. C0 (b) will cesutl in work that encroaches into an airport's operational airspace.
§&) (iv) none of the above.
23. The application involves: (tick the applicabto boxos)—
(1@ a material change of use assessable against the planning scheme for a purpose
Mentioned in schedute 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
D0 Gi) reconfiguring a tot—
(1 @ _ ontand that is completely or partly within a future public transport corridor,
future raitway land os a railway tunnel easement,
(1 &) on tand thats within 400m of a Citytrain passenger railway station or a fulure
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
©) ontand that abuts rail corridor tand, commercial corridor tand ar future railway
land, and the total number of lots increases;
(1 @) on tand that abuts rail corridor land, commercial comidor land or future raibway
land and an easement abutting the corridor or future raibway land is created;
Cl te} ontand that is completely or partly within 100m of, and abutting an approach
to, a raitway level crossing, and the total number of iots increases;
C1) __ fora residential purpose resulting in 100 o more alloiments.
OU (ti) operational wark assessable against the planning schema, but not associated with a
material change of use mentioned in () above or reconfiguring a lot mentioned in {ii}
above, involving extracting, excavating or filling greater than 50nF, on land that—
(1 {@) is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
1 tb) _ is completely or partly within future railway land, or a raway tunnel easement;
C1) abuts rail comidor tand, commercial comidor tand or future railway land, and
tha work is within 25m of the railway boundary.
EK) (iv} none of the above.
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: fick the applicabte boxtes)—
(0 @ a materiat change of use assessable against the planning scheme and not associated
with reconfiguring a tot, and any structure or work wil be located wholly or partly in the
easement.
O @ reconfiguring 2 tot
Gi) operational work assessable against the planning scheme, that is filling, excavation,
compaction, diilling, boring or piling not associated with a reconfiguring a lol, and the
work is located wholly or partly in the easement.
& GW) none of the above.
Pad
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0465 - Modification to Alternative Siting Provisions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.