INTEGRATED PLANNING ACT 1897
Development within the limits of a
port

ex core internation refer to Guido 18. For
inferratton abet prasenbad Kel work raf
‘Guide 24

(0 you arowered "YES" fh Q 2, the application
Argan refs be Por Putty
‘The Port Authority is a concurrence agency @ tha
davalopment is ~

(© wan 200ne of 0 shipping channel or an arity
‘nnd ck whipping consdar for he port

(© ein 1000 of a nning basin, 9 commercial
‘chipping wher, a mooring, anchorage ot apcid
ounce;

‘© witin £000 of » planned port fact idactiod
in aad cae plan approved under tha Traneport
Ibdrashuctre Act 1994

Arad ther situation te Port Auton ia om adic

eonncy.

IDAS Assessment Checklist, Vertion 180, 10 November 2006
12. Does the application involve development below high water mark'® and within the fimits of a port
under the Transport infrestructure Act 1994?
NO

YES - complete Part Mt af Form 1, or Pat P of Ferm 1 ¥the work is prescribed tds! work

 

Marinas

For more iatormation refer to Gyide $9. For
infornabon about whether m marina w proscribed
Adal wart refer bo Guida 24. The focal govemment
‘|p the exsenemend manager for aft preacribed Gdal
work,

yeu anevered NESW O13, the application
gga ised to Quonnainnd Eve end Reece

13, ‘Does fhe application imvatve operational work that is dal work for a maring® with more than 6
vessel berths?
no
(01 VES -complete Part M of Form 1, or Part P of Form 1 ithe tidal work is preseribed tidal wad

 

 

 

 

 

Sata en adece gnc
"Tidal works in strategic port land dal] 14. Does the application invalve tidal works within a strategic port tand tidal area?*?

areas EINo

Fererere rman ‘ort Golde 18. DYES - complote Past M of Form 1

‘Undewe you anawered NO? to C114, the nokarand Port]

Authonty is the asseescnant reasager fos Ce

‘sephcatian and the Environmental Protectan

ancy (7A ne Seman Lert (97 wre

‘concurrence apancica for

Heritage 15. Does the application involve development in a heritage registered place as defined under the
Far futher information roar to Guid 19. Queenstand Heritage Act 1992?

It you anewered “YES" 1. O15, the appieston {No

‘6ggere radar tthe

sm enncarence agency for he appcaten, 1D YES - complotn Past C of Form 1

Declared catchment areas 16. The application is in an area dectared to be a catchment area under the Water Act 2000 and
Fer mare domain inc aot tb acest involves: (tick the applicable boxfas)

RB eee wine oat (C1) reconfiguring a jot if any lot resutting from the reconfiguration is less than 16 hectares;
‘Unioes you answered "none of be ove ats, ((i) development assessable against the planning scheme involving the establishment or
be Pe expansion of a waste water disposal system, other than a disposal system far carrying
(aa). ‘out an environmentally relevant activity under the Environmental Protection Act 1994;
Coenen (ii) none of the above

‘concurrence egaocy for Ihe application in relation to
te rete,

Contaminated land

Applicators iorching reteral change cf ves sad!
or rocontiging & kt eazy higga his reer
Fer mare latorraaton refer to Guidy §.
Unlae yu revere one fis bar war,
the appication requires assessment by tha

EPA}. Ban

_agany Ofer than EPA's he asewesrpect menage
{or the application, EPA wil bo:a concurancs
{agency tor tho application in redaon to thie matter,

 

17. The application involves: (tick the applcable boxes)
CQ reconfiguring a lot for which all of part of the premises are -
(2) premises mentioned In the IPA, schedule 8, part 1, table 2—
* item 5, including the exemption otherwise provided for by paragraph (d};,
» item 6, including the exemption otherwise provided for by paragraph (e); or
» item 7, including the exempion otherwise provided for a mining activity or petroleum
activity, oF

{b} in an area for which an area management advice has been given for unexploded
ordnance - campiete Past W of Form 1
(C0) a material change of use-
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and # al! or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form f
£2] (&) none of the above

439. High water mark ie Gained in the Coastal Protection and ktsragaroaat Act 1905 and ence the ordinary high wale werk at eping fa.
20 Marina 8 deteed inthe Transport Operations (Lardioe Posioo} Ragutator 1995.
21 Siralegic port tana Sei areas are he aruas generally 50 mates seawerd of high water rea achacact in silage portland,

Pages

 

INTEGRATED PLANNING ACT 1997
Electricity infrastructure

For mann itersabon tar to ached 2ol he
Reaaaton

‘Uriaan yuu snewered ‘none of he above 6218,
‘Se copeaten tinge refer

‘agency.

of oa achico|

Land designated for community

infrastructure
Agpications ievohing development ca land

Sera coneniy etaenectco ney Vener

Ferner achete2feIB

‘Asadeton,

{you anwwored YES" o 019, the appicafen

requras asseesmoct by the clot execute of fie
uthossing the

department edrrinataring the Act
dorelogrent tor the teaigeuried purposs.
‘Wan agency cther than the dasigastcs ia the

 

{DAS Assossmen Chock, Voraion 18.0, 10 Noveerbor 2008
18. The application involves: (tick the applicable bases)

(00) reconfiguring a fot where any part of the lot ls -

« subject tp an easement in favour of a distribution entity or transmission enity under the
Electric Act 1994 and the easement is for a transmission grid o supply network urider
that Act; or

© Situated within 100m of a substation sito;

(1G) a material change of use, assessable against a planning scheme and not associated
with reconfiguring a tot if -

« any part of the premises is subject to an easement in favour of a distribution entity or
‘ransmission entity under the Electriaty Act 1994 and the easement is for a transmission
gid or supply network under that Act, and.

© any structure or work that is the natural and ordinary consequence of the usa is, ar will be,
locatad wholly or parfly in the easement;

O(a) a material change of use, assessable against a planning scheme and nat associated
with reconfiguring a lot if any part of the premises Is situated within 100m of a substation
site;

(1) operational work that is filing or excavation assessable against the planning schema,
not associated with reconfiguring a lot, if —
© any part of the premises is subject to an easement in favour of a distribution entity or

transmission entity under the Electriaty Act 1994 and the work is located wholly or partly in
the easement;

» the work is located wholly or partly within 10m of a substation sito;

[KI (¥)_ none of the above.

|
19. Does the application involve development assessable against the planning scheme and on land

designated for community infrastructure?
()_ intended to be supplled by a public sector entity; and
(i)_on land not owned by or on behalf of the State; and
(i) other than development -

(a) for the designated purpose; or

(b) carried aut by, or on behalf of, the designator.
{No
Oyes

 

Pageé

Used in these records

About this file

File size
1.5 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0465 - Modification to Alternative Siting Provisions [As Published].pdf · 1.5 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.