Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

06/0718 - Response to request for further information [As Published] · 132006.718

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

(C)_THIS WORK IS COPYRIGHT AND THE PROPERTY OF ROY K. SAINT PTY. LTD. IT MUST NOT BE COPIED, REPRODUCED RETAINED ON OR USED IN ITS ENTIRETY OR IN PARTS FOR ANY PURPOSE OTHER THAN THE SPEC

 

PURPOSE SET OUT HEREON WITHOUT WRITTEN PERMISSION

 

CARPARK AREA

 

 

HIGH LEVEL OVERFLOW FROM GPT 9 _|

|
|

 

 

 

 

 

ROCLA or FOX BGPCT OR EQUIVALENT UNIT

150¢ UPVC

GRADED @ 1in100

TO DETENTION TANK

 

 

 

 

 

 

water level varies

 

 

1506 UPVC
GRADED @ 1in100
FROM CARPARK

 

 

5000 LITRE
NON-POTABLE
DETENTION TANK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

150¢ UPVC

 

 

NOT TO SCALB

100¢ UPVC
LOW FLOW OUTLET GRADED @ 1in100

FROM DETENTION TANK

STORMWATER TANK
SCHEMATIC PLAN

1506 UPVC

HIGH LEVEL OVERFLOW
1

BOUNDARY

       

DRAINAGE EMT
TO BE CONFIRMED
BY TOWN PLANNER

OVERFLOW DISCHARGE FROM
ROOFWATER STORAGE TANK

NEW 600 SQR
FIELD INLET WITH
GRATED LID
OVER EXISTING PIPE

 

  

 

STORMWATER DRAINAGE NOTES

GENERAL

General: Provide stormwater drains to connect downpipes, surface drains, subsoil
drains and drainage pits to the outlet point or point of connection.

Downpipe connections: Turn up branch pipelines with bends to meet the downpipe,
finishing 50 mm (nominal) above finished ground or pavement level. Seal joints
between downpipes and drains.

Tolerances: Comply with the Pipeline tolerances table. These tolerances are conditional
on falls to outlets being maintained and no part of a pipeline being at less than the
designated gradient.

Pipe Materials

Stormwater pipe to be F.R.C. or U.P.V.C. class SH in accordance with AS3500.3
Connection to kerb to be galvanised RHS in accordance with AS1074 with minimum
coating mass of 500g/sqr.m

Identification
Lay a detectable strip or plastic tape in the trench after pipelaying, testing and initial
backfilling.

Pipe underlay

General: Bed piping on a continuous underlay of bedding material, at least 75 mm
thick after compaction. Grade the underlay evenly to the gradient of the pipeline.
Chases: If necessary, form chases to prevent projections such as sockets a flanges
from bearing on the trench bottom or underlay.

Pipe surrounds

General: Place the material in the pipe surround in layers 200 mm loose thickness,
and compact without damaging or displacing the piping.

Anchor blocks

If eceanaeyy provide anchor blocks which restrain lateral and axial movement of the
pipelines at junctions and changes of grade or direction.

Encasement

General: If necessary, encase the pipeline in concrete at least 150 mm above and
below the pipe, and 150 mm each side or the width of the trench, whichever is the
greater.

Concrete: Grade N20 to AS 1379.

Pipe depth

Provide the following minimum clear depths, measured to the crown of the pipe,
where the pipe passes below the following elements:

- 100 mm below formation level of the avemen kerb or channel.

- 100 mm below the average gradient of the bottom of footings.

- 450 mm below the finished surface of unpaved ground.

Jointing
At junctions of subsoil pipes provide tees, couplings or adaptors to AS 2439.1.
Trench width Minimum 450 mm.

Pipe underlay

General: Grade the trench floor evenly to the gradient of the pipeline. If the trench
floor is rock, correct any irregularities with compacted bedding material. Bed piping
on a continuous underlay of bedding material, at least 75 mm thick after
compaction. Lay the pipe with one line of perforations at the bottom.

Chases: If necessary, form chases to prevent projections such as sockets and flanges
from bearing on the trench bottom or underlay.

Pipe surrounds

General: Place the material in the pipe surround in layers 200 mm loose thickness,
and compact without damaging or displacing the piping.

nee of overlay: .

- To the underside of the bases of overlying structures such as pavements, slabs
and channels.

- To within 150 mm of the finished surface of unpaved or landscaped areas.

 

ISSUE DATE

 

GAG DESIGN

 

Sai

nt. Consulting

ENGINEERS

A.B.N. 15 096 410 909

MiEAust CPEng Aust.No.29986

RPEQ No.1476 NPER-3 No.40467

QBSA Lic.No. 16080

} STANLEY STREET, NAMBOUR QLD. 4560. 4564
PHONE : (07) 54412233 FAX : (07) 54763218
roy@saintconsutting. org

 

AT

FOR

STORMWATER MANAGEMENT DETAILS

OQOOOO0O0O

= N.T.S. (A3) ISSUE PRINTED: CADO01

inc No.|010207-11

 

 

 

Used in these records

About this file

File size
10.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_0718 - Response to request for further information [As Published].pdf · 10.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.