Skip to the record
Search everything, all in one place.

Council archive · source document

06/0718 - Response to request for further information [As Published] · 132006.718

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

LAND DEVELOPMENT

Item

Please note that Council allows for a single access driveway to each allotment. Therefore the proposed
split driveway should be replaced with a combined driveway 5.5m wide maximum. A car turning space
within the carpark will be required.

Response

Please refer to the proposal plans prepared by Saint Consulting Engineers namely Drawing No.
010207-02: Proposed Site Plan and Drawing No. 010207-10: Proposed Driveway Layout which
illustrate the amended driveway leading from the David Low Way into the development site. The
applicant has at the request of Council provided a single driveway which is tapered to the kerb
allowing vehicles to safely enter and exit the site.

The driveway has been designed taking into consideration the existing gully pit located within the kerb
on the David Low Way frontage (refer photo below) and will serve to retain some exiting vegetation
within the Council road reserve. The gully pit as illustrated on Drawing No. 010207-02: Proposed Site
Plan prevents the applicant from providing a single driveway at right angles to the street.

 

A vehicle turning bay has been provided at the request of Council.

Item
Provide design plan of the revised driveway and carpark showing the design levels and grades in
compliance with AS/NZS 2890.1:2004.

Response

Please refer to the proposal plans prepared by Saint Consulting Engineers namely Drawing No.
010207-10: Proposed Driveway Layout which illustrates the proposed design of the driveway and car
park including design levels and grades.

Item 4

The actual depth and location of the existing 150mm water main located approximately 1.5m from the
front boundary line (not shown on the submitted plans) should be determined to ensure a minimum
600mm cover be maintained over this pipeline. Probing or potholes is to be provided by Council at the
applicant’s cost.

Used in these records

About this file

File size
10.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_0718 - Response to request for further information [As Published].pdf · 10.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.