Council archive · source document
06/0718 - Response to request for further information [As Published] · 132006.718
Very large file (10.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Response Please refer to the proposal plans prepared by Saint Consulting Engineers namely Drawing No. 010207-02: Proposed Site Plan which illustrates the approximate location of the water main. The applicant advises Council that no earthworks or cutting will occur in this area for the driveway. The driveway will be made more solid than the existing due to the commercial standard which will further serve to protect the water main from any damage. Emailed correspondence (included as Appendix B) has occurred between Council’s John Fallon - Water and Sewerage Asset Management and Saint Consulting Engineers confirming that this can occur prior to building works. Item Provide documentation to clarify the legal right for the property to drain into the existing stormwater pipeline on the rear property. Response Please refer to the accompanying documentation included as Appendix G with respect to the legal right of discharge into the Council stormwater pipeline at the rear of the property. The lodgement of this documentation was deemed sufficient by Council's Monkeith Kadhum to address this matter. Item A general drainage design plan showing the stormwater disposal from the site including the provision of overland secondary flow path/s for 100 years storm events and demonstrate that the proposal will not have adverse impact on the drainage conditions over the adjoining properties. Response Please refer to the proposal plans prepared by Saint Consulting Engineers namely Drawing No. 010207-09: Earthworks and Sediment Control Plan and Drawing No. 010207-11: Stormwater Tank Schematic Plan which illustrate the proposed stormwater management proposal of the applicant. It is requested that Council seek further information with respect to the proposal with a subsequent operational works application. ENVIRONMENTAL HEALTH Ttem7 A Waste Management Plan (Operational) in accordance with Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-day operation of the complex and approved by Council's Environmental Health Section prior to issue of development permit for operational works. The Pian shall include the following information: - Ite The types of waste that will be generated from the activities approved within the development. Item 9 Estimated volumes or tonnage of recyclables within the generated waste stream Item 1 Estimated volumes or tonnage of waste generated from the activities. Item 11 Methods to be used for dealing with garden waste. Item 12 Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling. Item 13 - Description of procedures involving disposing of refuse to bins; the storage of bins and the collection of bins by the contractor and who is responsible for each transfer of the waste. Item 14 A description of the design details of waste storage and recycling areas including size, location, elevation and floor pian, methods of bin washing and of prevention of storm water contamination.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0718 - Response to request for further information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.