Landscape Specification
CONTENTS 2.7. CHANGES TO THE DESIGN Any constraints at site and due to that changes to the documented design need to be reported to the Landscape Architect. The Contractor is not to proceed without a written approval by the Landscape Architect. 2.8. REGULATIONS AND NOTIFICATION OF RELEVANT AUTHORITIES Performance of work to be in accordance with all applicable laws, rules and regulations required by authorities having jurisdiction over such work. All work need to comply with the National Construction Code (NCC) and Australian Standards. Further the Landscape works need to be compliance is with the: • Conditions of Approval • Approved Plan of Development • Approved Infrastructure Master Plan • Approved Concept Landscape Report Any work which is not complying need to be notified to the Landscape Architect. The landscape works must be coordinated with all relevant authorities and required development permits. If fire ants are suspected on the development site or locality, the relevant authorities must be contacted, being at the time of printing - the Department of Primary Industries & Fisheries Call Centre on 13 25 23. If Myrtle Rust is suspected on the development site or locality, the relevant authorities must be contacted, being at the time of printing – Biosecurity Queensland on 13 25 23 URBIS URB-SPC-LAN-P0025138 PAGE 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.