Original source · versioned page text
Landscape Specification
CONTENTS Hot Weather Placing When surrounding outdoor shade temperature exceeds 38°C, do not place concrete. To prevent premature stiffening of the fresh mix and reduce water absorption and evaporation losses utilise protection methods to prevent the rapid loss and evaporation of free mixing water from the concrete. Be sure to mix, transport, place and compact the concrete as rapidly as possible. Before and during placing maintain the formwork and reinforcement at 32°C using protection, cold water spraying, or other effective means. When placed in the forms, the temperature of the concrete must not exceed 35˚C for normal concrete in footings, beams, columns, walls and slabs and 27°C for concrete in large mass concrete sections; or concrete of strength 40MPa or greater, in sections exceeding 600 mm in thickness. Select one or more of the following methods of maintaining the specified temperature of the placed concrete: • Use chilled mixing water. • Spray the coarse aggregate using cold water. • Cover the container in which the concrete is transported to the forms. • Cool the concrete using liquid nitrogen injection before placing. • A combination of these methods Curing and Protecting Concrete Take responsibility for the curing and protection of the concrete. For example: protect freshly cast concrete from premature drying and excessively hot or cold temperatures. Erect windbreaks to shield the concrete surface during and after placing. Maintain the concrete at a reasonably constant temperature with minimum moisture loss for the curing period, refer AS 3600. Cure as soon as the surface of the concrete has hardened sufficiently to prevent damage but in no case later than two hours after the finishing operation has been completed. Cure by the following means: • The use of waterproof paper, or • The use of an approved polyethylene building film. • The use of other approved moisture retaining covering. If a method other than polyethylene film is adopted, secure the covering material against the concrete for the full length of edges and laps and at frequent intervals between so that no air circulation at the concrete surfaces occurs. Continue final curing for seven days for normal Portland cement concrete. For high early strength concrete, continue the final curing for three days. Prevent rapid drying out at the end of the curing period. Keep wet steel forms heated by the sun and wood forms in contact with the concrete during the final curing period. When the mean temperature of the air during curing is less than 5°C, maintain the temperature of the concrete between 10°C and 20°C for the required curing period. When the mean temperature of the air is in excess of 30°C during curing and moist curing is not employed, cover the surface with an approved heat reflecting plastic membrane. Apply this treatment for the whole of the curing period. Take special care with curing off-form concrete to avoid differences in colour. Curing compounds shall comply with AS 3799. Produce uniform colour on adjacent surfaces. Remove debris and form work from each area after stripping concrete as work sections are completed. Leave each area clean to the satisfaction of the Superintendent. Jointing Periods of stoppage in concrete of 3/4 hour or more are deemed to be construction joints. URBIS URB-SPC-LAN-P0025138 PAGE 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.