Landscape Specification

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

CONTENTS

                                  •   Mulched surfaces are to be kept clean and tidy and free of any deleterious
                                      material and foreign matter
                                  •   Check plants weekly of pest and disease infestation
                                  •   Spray for pests and disease infestations when the pest and fungal attack
                                      has been identified
                                  •   Apply a balance of man-made and natural slow release fertiliser to all
                                      planting areas in a 3-month interval.
                                  •   Check for signs of nutrient deficiencies (yellowing of leaves, failure to
                                      thrive), and adapt fertiliser regime to suit. Treat as required
                                  •   Aerate at 12-month intervals

 Green walls                      •   Test, rectify and adjust the watering regimes or water manually regularly as
                                      necessary to maintain optimum soil moisture levels in all areas
                                  •   Replace failed plans immediately
                                  •   Weed regularly (weekly)
                                  •   Check plants weekly of pest and disease infestation
                                  •   Spray for pests and disease infestations when the pest and fungal attack
                                      has been identified
                                  •   Apply fertilizer as per manufactures manual
                                  •   Check for signs of nutrient deficiencies (yellowing of leaves, failure to
                                      thrive), and adapt fertiliser regime to suit. Treat as required

 Trellis System                   •   Test, rectify and adjust the watering regimes or water manually regularly as
                                      necessary to maintain optimum soil moisture levels in all areas
                                  •   Bind up climbing plants
                                  •   Replace failed plans immediately
                                  •   Weed regularly (weekly)
                                  •   Check plants weekly of pest and disease infestation
                                  •   Spray for pests and disease infestations when the pest and fungal attack
                                      has been identified
                                  •   Apply fertilizer as per manufactures manual
                                  •   Check for signs of nutrient deficiencies (yellowing of leaves, failure to
                                      thrive), and adapt fertiliser regime to suit. Treat as required

 Irrigation                       •   Adjust irrigation control as required by the respective season
                                  •   Check irrigation system of possible leaks and sound operation of automatic
                                      system monthly
                                  •   Flush irrigation system at 12-month intervals.
                                  •   Maintain irrigation component as required by the manufacturers manual

 External furniture and           •   Maintained in accordance to manufacturer’s instructions
 structure                        •   Apply sealer in accordance to manufacturer’s instructions


 Timber Works                     •   Inspect monthly
                                  •   Removal of splinters, the replacement of cracked, cupped or degraded
                                      boards as identified at inspection
                                  •   Apply a light sand and preservative coat in accordance with manufacturers
                                      specification at 6-month intervals
                                  •   Retightening and/or replacement of fixings at 12-month intervals

 Artificial Timber Works          •   Inspect monthly
                                  •   Sweep deck and clean gaps between the boards regularly
                                  •   Clean deck in the intervals and with a cleaning product recommended by
                                      the manufacturer
                                  •   Do not use high pressure cleaners
                                  •   Treat scuffs and scratches as per manufacturers recommendation




URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX                                                                             PAGE   67
Log in to download the original file

LANDSCAPE SPECIFICATION.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.