Landscape Specification
CONTENTS
Tree / Palm • Monitoring / adjusting the irrigation system or watering regime in liaison
Transplanting with the Landscape Contractor, water if required
• Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• Spray for pests and disease infestations when the pest and fungal attack
has been identified
• Apply fertilize once root growth & water uptake has begun
• Wrap trunk/branch to prevent sun scald if necessary due to leaf loss >40%
• Prune dieback
• Top up soil and mulch
• For thin or smooth bark trees, if more than 40% of the foliage is shed due
to post-transplant stress then the trunk and branches (greater than 50mm
diameter) are to be wrapped with light coloured biodegradable paper or
hessian to reduce bark scalding. Wrap from the bottom of the trunk
upwards so the layers overlap and thus shed water.
• Organise soil testing
• Adjust and/or replace stakes and ties monthly. Remove staking and visible
guying after 11 months.
• Weed regularly (weekly)
Swale / Bio Pods • Test, rectify and adjust the watering regimes or water manually regularly as
necessary to maintain optimum soil moisture levels in all areas
• The uses of synthetic, granular blended fertilisers on the site are not
permitted. Slow release organic tree tablets shall be used at establishment.
• Spray for pests and disease infestations when the pest and fungal attack
has been identified
• Replace failed plans immediately
• Weed regularly (weekly)
• Top up gravel mulch as required
• Sweep and/or remove from bio-pod area any fallen branches and leaf
(including any autumn leaf drop), grass clippings and other garden debris.
• Maintenance of the bio-pods includes the detention area, 1:3 batters, kick
edges, bio-pod grate covers, and gutter in front of the bio-pod.
• Subsoil drains are to be cleaned out and accumulated sediment manually
removed from the surface area of the bio retention device at Off
Maintenance and as required during the maintenance period.
URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX PAGE 68
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.