Original source · versioned page text
Landscape Specification
CONTENTS
HOLD POINTS CHKD DATE / NOTES
Soil testing
8 Soil testing
Set out
9 Set out of hardscape areas
10 Set out for walls and edges
11 Set out for furniture items
12 Set out for lights
Grading
14 On-Grade subsoil drainage installed and tested prior
to backfilling
15 Pavement areas compacted prior to spreading base
material
16 Planters clean of all rubbish and builder’s debris prior
to soil placement
17 Surface grading and depth of planting soil prior to
installation of plants
Planting
18 Plants / transplant when delivered to site, prior to
being unloaded from the truck to check for transport
related damage
19 Setout and installation of tree trenches
20 Layout of shrubs and groundcovers prior to planting
21 Layout and orientation of trees prior to planting
Irrigation
22 Extent and number of different irrigation zones to be
confirmed and agreed prior to installation
URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX PAGE 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.