CONTENTS


22.         INSPECTIONS
The Contractor must request the Landscape Architect to attend inspections at the required inspections noted
in this document and as advised by the Landscape Architect. An Inspection schedule shall be developed in
conjunction with the Superintendent.

The Superintendent shall undertake inspections of construction work carried out by the Contractor
throughout the period of the Contract. Any delays or extensions to the program or maintenance period, and
associated costs arising from lack of notification to Landscape Architect by the Superintendent, are to be
borne by the Superintendent and Contractor. The Contractor is to provide at least 48 hours notice to the
Superintendent prior to any inspection required.

Work is not to proceed without approval from the Landscape Architect. Failure to gain approvals may result
in rectification of substantial amounts of work at the Contractor’s expense.

The Landscape Architect may inspect the works without notice at any time.

Pre Start Meeting
The landscape pre-start meeting must be conducted prior to work commencing on site, giving at least 5
business days’ notice.

The pre-start meeting must be attended by the:

•    Project Manager
•    Superintended
•    Landscape Contractor;
•    Landscape Architect;
•    Council and / or relevant stakeholder representative
•    All other relevant parties.

Soil Inspections and Testing
An agronomist shall undertake inspections, sampling and testing of ameliorated site topsoil and imported soil
throughout the period of the Contract. The Superintendent is to provide at least 48 hours notice to the
Landscape Architect prior to any inspection that an agronomist will be on-site with all reporting (Certification
that the ameliorated site topsoil meets AS 4419 – Soils for Landscaping and Garden Use) due within 48
hours after the inspection.

Inspections and testing are to be carried out as per section 15.1 in this specification

The Contractor shall be responsible for engaging a qualified Agronomist for inspections or nominate
preferred Contractor for review/approval by the client.

Structural Inspections during Construction
A Structural Engineer engaged by the contractor shall undertake inspections of structural construction work
carried out by the Contractor throughout the period of the Contract. The Contractor is to provide at least 48
hours-notice to the Superintendent prior to any inspection that the Structural Engineer will be on-site with all
reporting (Structural Certifications) due within 48 hours after the inspection.

Practical Completion Inspection
At Practical Completion the Contractor, the Landscape Architect, the Superintendent and the Project
Manager shall carry out a joint Inspection to ensure all landscape works have reached practical completion.

Items identified requiring attention, during the inspection are to be addressed immediately or as agreed.

The practical completion marks the start of the 52 weeks Establishment maintenance and Defects Liability
period.




URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX                                                                           PAGE   71
Log in to download the original file

LANDSCAPE SPECIFICATION.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.