Original source · versioned page text
Landscape Specification
CONTENTS
22.1. INSPECTION SCHEDULE
Inspections CHKD DATE / NOTES
1 Prestart Meeting
2 Hold point inspections as per Hold point schedule
3 Practical Completion Inspection
4 Defects Completion Inspection
5 End of Establishment Maintenance Inspection
6 Quality Control Inspection
7 Handover
URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX PAGE 73
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.