Council archive · source document
Town Planning Assessment Report · MCU25/0021
construction of buildings in flood
hazard areas.
Major Electricity Infrastructure AO18.1 Development including any Not applicable
& Substations sensitive land uses is at least: The site is not mapped as
PO18 Development is sufficiently 1. 50 metres from a containing major electricity
separated from major electricity transmission substation; infrastructure or substations.
infrastructure and substations to 2. 10 metres from any other
minimise the likelihood of nuisance substation; and
or complaint.
3. 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are not Not applicable
located within an easement for a The site is not mapped as
distribution line. containing major electricity
infrastructure or substations.
PO19 Development is located and AO19 Noise emissions do not Can comply with AO19
designed to avoid or minimise noise exceed 5db(A) above background
nuisance from the use of noise level internal to a habitable
infrastructure. building measured in accordance
with AS1055.
PO20 Wherever practicable AO20 Where adjoining substations Not applicable
habitable buildings are orientated to or major electricity infrastructure,
avoid direct overlooking of major habitable buildings are orientated
electricity infrastructure or so that the majority of outdoor
substations. living areas and windows of
habitable rooms face away from the
infrastructure.
PO21 Earthworks and drainage AO21 Filling other than Can comply with AO21
operational works do not directly, accessways:
indirectly or cumulatively cause 1. does not extend more than
adverse impacts external to the the equivalent of 3 metres
development site by: around the main building,
1. causing ponding of water measured from the outer
on the site or nearby walls of the building;
land; 2. is limited to a maximum of
2. increasing flooding, which 500m2; and
adversely affects the 3. does not impact on the local
safety or use of any land drainage of adjoining
upstream and properties.
downstream;
3. adversely affecting the
flow of water in any
overland flow path; and
4. adversely affecting the
privacy or visual amenity
of surrounding property.
25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.