Council archive · source document
Request to Extend Relevant Period - 152006.1999.01
Very large file (10.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
==mc
-
ua'.lfe
i'IllI!
0 N S U LTAN T S
lli
•
Specific Outcomes Probable Solutions Comments
accommodation unit component of an
Entertainment and dining business
Type 3- the maximum gross floor area
is equivalent to the maximum allowable
population in persons multiplied by
40m'.
010 For the Neighbourhood Centre
Zone and the BusinessCentre Zone the
maximum plot ratio does not exceed-
a) 0.8:1 for the first 2,OOOm'of site
areas; plus
b) 0.3:1 for the balance of the site areas
in excessof 2,OOOm'.
Flooding and drainage 511.1 For new buildings or structures or 011 - Complies. Reference is made
011 Buildings and other works are additions of more than 50m2 gross floor to the requirements of the current
designed and sited to- area to an existing building or structure, conditions 68 to 73 with respect to
a) provide flood free accessto premises floor levels for habitable roams are- possible flooding.
and flood free habitable areas; a) for areas where minimum floor levels
b) allow only minor, short term and are available-not less than the A dwelling house on each lot will
infrequent flooding of non-habitable specified level; need to comply with relevant
areas; b) for areas where flood modelling is freeboard and habitable floor levels
c) ensure carparking areas can be available-a minimum of 300mm requirements (if necessitated) as
adequately drained; above the modelled flood level; and part of subsequent building works
d) ensure drainage does not adversely c) for areas where flood modelling is not application approval process in
impact upon other premises; and available, a minimum of 300mm accordance with QDC, BCAand
e) ensure filling or excavation does not above the highest known flood level; Council's requirements at the time
adversely impact upon other premises AND of lodgement.
by- 511.2 Where Council infrastructure is
i. causing ponding of available-
water on the site or a) any drainage (from buildings and
nearby land; land) flows to that infrastructure; and
ii. increasing flooding, b) the infrastructure has the capacity to
which adversely affects accept any additional loading;
the safety or use of any AND
land upstream and 511.3 For Residential Uses-
downstream; and a) where slab on ground construction is
iii. adversely affecting the used, filling does not extend more than
flow of water in any 1m beyond the building footprint and
overland flow path. access to car parking areas, measured
from outer walls of the building; or
b) the design consists of a suspended
floor construction;
AND
511.4 Car parking and maneuvering
areas are constructed at a level that
permits the parking area to drain from
the site by gravity means, without the
need for mechanical pumping; or
511.5 Basements for residential uses
have flood immunity above the 1%AEP
defined flood event where alternative
means to mechanical pumping are used
to achieve such immunity; or
511.6 Basements for non-residential
uses have flood immunity above the 1%
AEP defined flood event that may be
JFP Ref: Ml775 Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Extend Relevant Period - 152006.1999.01Related documentApplication case desk ↗
Request to Extend Relevant Period - 152006.1999.01Related documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.