Skip to the record
For the highest quality transcripts.

Original source · versioned page text

39 Lorilet 05 Bushfire Hazard Overlay Code

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Bushfire Hazard Overlay Code

Performance outcomes                                Acceptable outcomes

Safety of people and property
PO1                                                 AO1.1                                                   Existing site conditions are not to be
Development maintains the safety of people and      Development which will materially increase the number changed.
property from the adverse impacts of bushfire.      of people living or congregating on premises, including
                                                    reconfiguring a lot, is not located within a medium or
                                                    high bushfire hazard area.

                                                    AO1.2                                                    Existing setbacks are maintained. This
                                                    Development maximises setbacks from hazardous            residential area is not subject to hazardous
                                                    vegetation to achieve an acceptable risk.                vegetation.

                                                    Editor’s Note — PSP8 Natural Hazards provides guidance
                                                    for assessing bushfire hazard risk and preparing a
                                                    bushfire hazard management plan.
Impacts on Ecologically Important Areas
PO2                                                                                                          Existing vegetation conditions are to remain.
Bushfire mitigation measures do not adversely       No acceptable outcome provided                           No impact.
impact on:

         1. biodiversity values, connectivity and
            ecosystem functioning; and
         2. the long term physical integrity of
            waterways, wetland and areas of
            native vegetation.
Water Supply for Fire Fighting Purposes
Log in to download the original file

39 Lorilet 05 Bushfire Hazard Overlay Code.pdf · 172 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 5 pages

Page 2

Performance outcomes                                  Acceptable outcomes
PO3                                                   AO3.1                                                    Existing firefighting water supply is
Development provides an adequate water supply         Premises are connected to the reticulated water supply. established in the area since approximately
for fire fighting purpose which is reliable, safely                                                            mid-1980s.
located and freely accessible.                        Editor's note—For reconfiguring a lot, water supply
                                                      needs to provide for a minimum flow and pressure of 10
                                                      litres a second at 200kPa at all times for fire fighting
                                                      purposes.

                                                      OR

                                                      AO3.2                                                     Not applicable.
                                                      Where there is no available reticulated water supply, the
                                                      premises has:

                                                               1. an accessible dam, swimming pool or water
                                                                  tank available for fire fighting purposes
                                                                  with an onsite water volume of not less
                                                                  than 5,000 litres; and
                                                               2. a water supply outlet pipe 50 millimetres in
                                                                  diameter fitted with a standard fire brigade
                                                                  fitting connected to the water supply (other
                                                                  than where the water supply is in a
                                                                  swimming pool or dam).

                                                      Editor’s Note—Water supply capacity for fire fighting
                                                      purposes is in addition to water supply capacity for other
                                                      uses and activities on the premises.

Essential Community Infrastructure

Page 3

Performance outcomes                                Acceptable outcomes
PO4                                                 AO4.1                                                       No essential community infrastructure issues
Essential community infrastructure is able to       Development involving essential community                   are presented.
function effectively during and immediately after   infrastructure is not located within a medium or high
bushfire events.                                    bushfire hazard area.

                                                    OR

                                                    AO4.2
                                                    Where located in a medium or high bushfire hazard area,
                                                    development involving essential community
                                                    infrastructure is designed to function effectively during
                                                    and after a bushfire event in accordance with a Bushfire
                                                    Hazard Management Plan.

                                                    Editor’s Note— PSP8 Natural Hazards provides guidance
                                                    for assessing bushfire hazard risk and preparing a
                                                    bushfire hazard management plan.
Hazardous Materials
PO5                                                 AO5                                                         Not applicable.
Public safety and the environment are not           Hazardous materials are not manufactured or stored in
adversely affected by the impacts of bushfire on    bulk in a bushfire hazard area.
hazardous materials manufacturing or storing in
bulk.
Access and Evacuation Routes
PO6                                                 AO6.1                                                       No change to the road layout.
Roads provide for easy and safe evacuation of       The road layout provides for through-roads and avoids
residents of premises and access by emergency       cul-de-sacs and dead-end roads.
services.
                                                    OR

Page 4

Performance outcomes                                Acceptable outcomes

                                                    AO6.2
                                                    The development has a perimeter road reserve with a Not applicable.
                                                    minimum width of 20 metres and maximum gradient of
                                                    12.5%.

                                                    OR

                                                    AO6.3
                                                    Cul-de-sacs or no-through roads are provided with fire     Not appliable.
                                                    trails or access easements, which are capable of being
                                                    navigated by conventional vehicles and which link to
                                                    through roads.

                                                    AO6.4
                                                    Safe access and egress is available at all times to all of Safe access does exist.
                                                    the development for emergency vehicles and personnel.

                                                    AO6.5
                                                    Where an emergency access point is required, it            Not applicable.
                                                    complies with the relevant works codes and PSP6
                                                    Engineering Design Standards.
Lot design
PO7                                                 AO7                                                        No change to the overall aspects to the
Lot design and building siting minimises bushfire   Each residential lot:                                      design of the lots is proposed.
hazard risk to people and property.
                                                             1. includes a building envelope, identified on a Both lots have an existing building.
                                                                plan of subdivision;
                                                             2. is of sufficient size and shape to allow for Not applicable
                                                                efficient emergency access to buildings for

Page 5

Performance outcomes                              Acceptable outcomes
                                                              fire fighting appliances (e.g. by avoiding
                                                              battle-axe/hatchet lots and long narrow
                                                              lots with long access driveways to
                                                              buildings);
                                                           3. where more than 2500m², achieves            Not applicable.
                                                              setbacks from hazardous vegetation in line
                                                              with Bushfire Attack Level 29 requirements
                                                              as per AS3959; and
                                                           4. is designed so
                                                              that buildings and structures are sited in  Not applicable.
                                                              locations of lowest hazard within the lot
                                                              and elements of the development least
                                                              susceptible to fire are closest to the fire
                                                              hazard.
Firebreaks and fire access tracks
PO8                                               AO8.1                                                    No change to the road layout.
Firebreaks and fire access tracks provide:        Where development involves the creation of a new road
                                                  and lots, a firebreak is provided by providing a cleared
         1. adequate access for fire fighting and road reserve not less than 20 metres wide and maximum
            other emergency vehicles; and         gradient of 12.5% around the perimeter of the
         2. adequate access for the evacuation subdivision, between the created lots and surrounding
            of residents and emergency            vegetated lands.
            personnel in an emergency situation.
                                                  OR

                                                  AO8.2                                                    Not applicable.
                                                  Fire access tracks are provided between the created lots
                                                  and surrounding vegetated land that:

                                                           1. have a cleared minimum width of 6 metres;

Page 6

Performance outcomes   Acceptable outcomes
                               2. have a maximum gradient of 12.5%;
                               3. provide unbroken access for fire fighting
                                  vehicles;
                               4. provide passing bays and turning areas;
                               5. are located within an access easement that
                                  is granted in favour of Noosa Council and
                                  the Queensland Fire and Rescue Service.

                       AO8.3
                       Bushfire management measures are carried out on the     Not applicable.
                       subject property and not any adjoining property.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.