Council archive · source document
body corporate approval · 132003.220660.5
1 Lot 1 - Improvements to Lot
MOTION
That, in accordance with the By-Laws that the Body Corporate gives approval for Owner of Lot 1 to
proceed with improvements to their Lot on the following conditions:
1. The improvement does not detract from the appearance of any lot included in, or common
property for, the scheme.
2. The use and enjoyment of the improvement is not likely to promote a breach of the owner’s
duties as an occupier.
3. Approval (if required) must be obtained from the local Council, prior to commencement of the
work and a copy of this approval provided to the Body Corporate.
4. The works must be constructed in accordance with the approval granted by the local Council
and the details contained in the renovation application.
5. The installation of floor tiles, floating timber or other flooring must also have installed
appropriate sound proofing required:
o as designated by Australian Standards; and
o to ensure that all floor space within the lot is covered or otherwise treated to an
extent sufficient to prevent the transmission from the floor space of noise likely to
disturb the peaceful enjoyment of the owner or occupier of another lot.
6. The work must be completed by a suitably qualified and licensed contractor that holds the
appropriate insurance, to cover the owner and Body Corporate.
7. Construction must comply with the existing by laws and not interfere with adjoining
neighbours.
8. During completion of the works no materials or other items associated with the works are to
be placed or remain on common property, without the prior written approval of the Body
Corporate.
9. Any damage to common property caused by the works is to be repaired within 7 days at the
Owner’s cost.
10. All costs associated with the works and future maintenance are the responsibility of the
Owner of the lot.
11. They must meet all the requirements of applicable legislation, regulations and Australian
Standards and not affect the certification of the building (any works carried out in
contravention of legislation or building certification must be rectified at the cost of the Owner).
12. Any structural works require a report from a Registered Professional Engineer of Qld to be
provided to the Body Corporate prior to the works commencing.
13. On completion of the works, a copy of certification from an Independent Building Certifier to
be provided to the Body Corporate, at the cost of the Owner.
14. The Owner must unconditionally waive any liability and/or responsibility otherwise, on the
Body Corporate / Committee for any damage or loss occasioned by the works, no matter
whatsoever caused and acknowledges that this may not be covered under the scheme
insurance.
Furthermore, if installation approved that the owner be responsible for future maintenance thereof
inclusive of any insurance claims arising from & any water ingress arising from said
installation/improvements.
Motion CARRIED. Yes 2 No 0 Abstain 0 Invalid 0
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
body corporate approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 187 KB (small file)
- File type
No other editions are linked here.