Original source · versioned page text
12. Existing EA (2016)
Permit Environmental authority EPPR00439413 Agency interest: General Condition | Condition number 3-G1 Activity Dredging is limited to dredge material from the bed of any waters (other than dredging by a port authority of material for which a royalty or similar charge is not payable) using plant or equipment having a design capacity of not more than 5,000 tonnes per year. 3-G2 The only areas permitted to be dredged under this environmental authority are shown as ‘Dredging Sites’ A, B, C and D depicted on Figure 2 of the Noosaville Dredge Management Plan produced by Noosa Council Environmental Services and Works, dated November 2006, and Schedule 5 — Figure 2 of this environmental auhtority. 3-G3 The placement of dredge material may only occur on the areas shown on Noosa River Maintenance Dredging and Nourishment drawings NRN-A1, NRNA-2, NRNA-3, NRNA-4, NRNA- 5 and NRNA-6 as provided by Intl Coastal Management for Noosa Council dated 7 October 2005. 3-G5 Community consultation plan A community consultation plan must be developed prior to the commencement of the activity and implemented prior and during the carrying out of the activity. Agency interest: Water Condition | Condition number 3-W1 Contaminants must only be released to surface waters from the discharge location(s) below and in compliance with the release limits listed in Table 5: Contaminant release limits to water. 1. discharge location 1 — wastewaters discharge point from the dredged material placement pipe or the discharge point of any drainage system used during the transfer of dredge material; and 2. discharge location 2 —- dredging action while extracting material from dredge sites. Page 10 of 24 * GK130701 * EM797 « Version 1 Department of Environment and Heritage Protection
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.