16216_Service Report_150217
Attached to the e-mail Services report MCU17/0014.
| aaa CONSULTING ENGINEERS BORNHORST + WARD | DOONELLA UNITS CIVIL AND STRUCTURAL 45m? was determined through the application of the Rational Method as outlined in QUDM. Refer to Bornhorst and Ward’s Stormwater Management Plan for further information. 3.1.4 Stormwater Quality The development, with a total developable area of 2,519m? does require stormwater treatment as per the requirements set out in the State Planning Policy for a site with a developable area greater than 2500m2. A proprietary stormwater quality device is proposed to treat stormwater runoff prior to its discharge from the site. Refer to the proposed Stormwater Layout Plan within Appendix B and Bornhorst and Ward’s Stormwater Management Plan for further information. 3.2 EARTHWORKS Earthworks will be required to construct a level basement to facilitate the parking demands of the development and to ensure the site can be adequately serviced. A detailed earthworks plan will be prepared as a part of the detailed design operational works lodgement. Refer to the preliminary earthworks plan within Appendix B for further information. The site has been identified on Noosa Shire Council’s Natural Hazard: Acid Sulphate Overlay. As the proposed development is to undertake filling and excavation below RL 20.0m AHD, it is anticipated that Acid Sulfate Soils may be encountered. Therefore it is recommended that an Acid Sulfate Soil investigation be completed as part of the detailed geotechnical investigation conducted for the site. If Acid Sulfate Soils are present, then an Acid Sulfate Soil Management Plan will be required. All earthworks will be undertaken in accordance with Noosa Shire Council guidelines. See Noosa Shire Council’s Potential Acid Sulphate Overlay Map in Appendix C for further information. 3.3 ROADWORKS Internal roadworks will be required to facilitate the development. Site access is proposed via a separate left in only site access and left out only site exit onto Doonella Street. A 3m wide public thoroughfare easement is proposed adjacent to the northern verge of the development. Refer to the Archicology Architectural Plans within Appendix A for further details. Any proposed road works will be undertaken in accordance with Noosa Shire Council Guidelines. 3.4 SEWER 3.4.1 Existing Infrastructure There is existing sewerage infrastructure located within and surrounding the development site. An existing sewer main drains east within Sidoni Lane to the north of the site. An existing sewer main drains east parallel to Doonella Street within the southern boundary of the site. Manholes are located in the south east corners of lots 32 and 38 Doonella Street. Lot 30 and 32 Doonella Street are currently serviced via the sewer main running within the southern boundary of each lot. 3.4.2. Proposed Infrastructure It is proposed to service the development via a connection into the existing manhole in the south-east of the site. The site naturally grades to this location. A Service Advice Notice application has been lodged with Bornhorst + Ward Pty Ltd Level 4, 67 Astor Terrace, Spring Hill, Qld 4000P Ph. (07) 3013 4699 / [email protected] A.B.N. 78 010 151 354
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Service Report_150217.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.