16216_Service Report_150217
Attached to the e-mail Services report MCU17/0014.
| aaa CONSULTING ENGINEERS BORNHORST + WARD | DOONELLA UNITS CIVIL AND STRUCTURAL Unitywater to confirm the capacity of this line and whether this capacity is sufficient to service the development. Works required to service the site will be undertaken in accordance with Unitywater requirements and procedures. All of the internal sewer infrastructure will be documented by the hydraulic consultant. Refer to the Proposed Sewer Connection Plan within Appendix B for further information. 3.5 WATER 3.5.1 Existing Infrastructure There are two water reticulation mains within the northern and southern verges of Doonella Street which connect to a trunk main within the junction of Doonella Street and Memorial Avenue. Refer to the Unitywater DBYD plans within Appendix C for further information. 3.5.2 Proposed Infrastructure The proposed development site will connect into the existing water main within the northern verge of Doonella Street. A Service Advice Notice application has been lodged with Unitywater to confirm the capacity of this line and whether this capacity is sufficient to service the development. Works required to service the site will be undertaken in accordance with Unitywater requirements and procedures. All of the internal water infrastructure will be documented by the hydraulic consultant. Refer to the Proposed Water Connection Plan within Appendix B for further information. 3.6 ELECTRICITY The site is currently serviced via overhead powerlines and underground conduits which run along the northern verge of Doonella Street. Electricity services required for the proposed development will be designed by the electrical engineer and will be assessed by Energex during the detailed design phase of the development. Refer to the Energex Asset Plans within Appendix C for further information. 3.7 COMMUNICATIONS Communications infrastructure is available in the northern verge of Doonella Street to the south of the site. All works required to provide communication services to the proposed development will be undertaken with Telstra’s approval and coordination. Refer to the Communication DBYD plans within Appendix C for further information. 4. SUMMARY This report relating to the proposed multi level residential/commercial redevelopment located at 30-32 Doonella Street, Tewantin has shown the following: e The proposed development site has no flood levels or flags for building or development purposes and is expected to be low risk. e A 45m? stormwater detention tank is proposed to offset the increased impervious area of the development and the associated increase in discharge. e In accordance with the State Planning Policy, a proprietary stormwater quality device is proposed to treat stormwater runoff prior to its discharge from the site. Bornhorst + Ward Pty Ltd Level 4, 67 Astor Terrace, Spring Hill, Qld 4000P Ph. (07) 3013 4699 / [email protected] A.B.N. 78 010 151 354
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (16216_Service Report_150217.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.