Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 108, section 1. The text section number identifies this passage in the reader.

                                                 AND

                                                 14.3    Development in the vicinity of rail corridors
                                                 meets the following external design level noise criteria
                                                 –
                                                 a) 65dB(a), assessed as the 24hour average equivalent
                                                 continuous A-weighted sound pressure level; and
                                                 b) 87dB(A), assessed as a single event maximum
                                                 sound pressure level.

14.150   Staged Development
O15 Staged development is planned,               No solution provided.                                      Not applicable.
designed and constructed to ensure that—
a) each stage of the development can be                                                                     The proposed development is not for a staged development.
constructed without interruption to services
and utilities provided to the previous stages;
b) the infrastructure provided is capable of
servicing the entire development; and
c) the materials used are consistent
throughout the development.

14.151 Alterations to services and utilities
O16     Any    alterations    or   repairs to S16.1 Any alterations or repair to infrastructure as a        Complies.
infrastructure as a result of the development result of the development are completed at the
are made at no cost to Council.               developer’s expense.                                          Any alterations or repairs to infrastructure required as a result of works
                                                                                                            carried out during construction will be carried out at the developer’s
                                                                                                            expense.

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.