Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 116, section 1. The text section number identifies this passage in the reader.
constructed— constructed in accordance with PSP6 – Engineering No extension of Council’s sewerage infrastructure is required for the
a) in accordance with appropriate Design Standards — Water and Sewerage and As proposed development.
engineering standards; and Constructed data submitted in accordance with PSP6
b) to minimise adverse environmental – Engineering Design Standards — Water and
impacts Sewerage;
AND
S9.2 Erosion and sediment control measures are
designed and implemented in accordance with the
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites.
O10 Sewerage reticulation infrastructure is No solution provided. Not applicable.
proven to be suitable for its use prior to
Council accepting the dedicated asset. No extension of Council’s sewerage infrastructure is required for the
proposed development.
O11 Sewerage reticulation infrastructure is No solution provided. Not applicable.
provided with all supporting technical
documentation. No extension of Council’s sewerage infrastructure is required for the
proposed development.
O12 Where buildings or other structures are S12.1 The footing of any structure or building is Complies.
developed adjacent to Council’s sewerage located clear of the zone of influence but no closer
reticulation infrastructure, satisfactory than 1.5m (measured horizontally) from The proposed building is setback greater than 1.5m from Council’s
provision is made to protect the infrastructure including sewers, water mains and reticulated sewerage main.
infrastructure from physical damage and to stormwater structures;
allow ongoing maintenance by Council. AND
S12.2 A registered easement in favour of Council is
created over all underground infrastructure located
in private property;
AND
S12.3 The width of the easement is the greater of
3m or the width of the zone of influence;
AND
S12.4 The easement is centred over the centreline
of the infrastructure.
O13 Alignment of sewerage reticulation S13.1 Infrastructure is constructed on the preferred Not applicable.
infrastructure is to allow for easy access for alignments in accordance with PSP6 –Engineering
the ongoing maintenance by Council. Design Standards — Water and Sewerage No extension of Council’s sewerage infrastructure is required for the
proposed development.
O14 Any alterations or repairs to S14.1 Any alterations or repair to infrastructure as Complies.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.