Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 115, section 1. The text section number identifies this passage in the reader.
proposed development.
O5 Where buildings or other structures are S5.1 The footing of any building or structure is Complies.
in proximity to State or Council’s water located clear of the zone of influence but no closer
supply infrastructure, provision is made to than 1.5m (measured horizontally) from The eastern wall of the proposed building is setback greater than
protect the infrastructure from physical infrastructure including sewers, water mains and 1.5m from Council’s reticulated water main. The proposed building is
damage and to allow ongoing maintenance stormwater structures; not located nearby any other Council infrastructure.
by Council. AND
S5.2 A registered easement in favour of Council is
created over all underground infrastructure located
in private property;
AND
S5.3 The width of the easement is the greater of
3m or the width of the zone of influence;
AND
S5.4 The easement is centred over the centreline of
the infrastructure.
O6 Alignment of water supply infrastructure S6.1 Infrastructure is designed and constructed on Not applicable.
allows for easy access for the ongoing the preferred alignments in accordance with PSP6
maintenance by Council. Engineering Design Standards – Water and No extension of Council’s water infrastructure is required for the
Sewerage. proposed development.
O7 Any alterations or repairs to S7.1 Any alterations or repair to infrastructure as a Complies.
infrastructure as a result of the development result of the development are completed at the
are made at no cost to Council. developer’s expense. Any alterations or repairs to infrastructure required as a result of
works carried out during construction will be carried out at the
developer’s expense.
Table 14-63 Sewerage Reticulation
14.165 Design and construction (sewer)
O8 Sewerage reticulation infrastructure— S8.1 Sewerage reticulation infrastructure is Not applicable.
a) meets the needs of the users; designed in accordance with PSP6 Engineering
b) is designed to be compatible with existing Design Standards – Water and Sewerage. No extension of Council’s sewerage infrastructure is required for the
infrastructure; and proposed development.
c) is designed using materials that are
suitable of the use, durable, easy to maintain
and cost effective, taking into account the
whole of life cycle cost and Council’s
maintenance inventory.
O9 Sewerage reticulation infrastructure is S9.1 Sewerage reticulation infrastructure is Not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.