Skip to the record
For the highest quality transcripts.

Council archive · source document

Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 115, section 1. The text section number identifies this passage in the reader.

                                                                                                          proposed development.

O5 Where buildings or other structures are       S5.1 The footing of any building or structure is         Complies.
in proximity to State or Council’s water         located clear of the zone of influence but no closer
supply infrastructure, provision is made to      than     1.5m     (measured     horizontally)  from      The eastern wall of the proposed building is setback greater than
protect the infrastructure from physical         infrastructure including sewers, water mains and         1.5m from Council’s reticulated water main. The proposed building is
damage and to allow ongoing maintenance          stormwater structures;                                   not located nearby any other Council infrastructure.
by Council.                                      AND
                                                 S5.2 A registered easement in favour of Council is
                                                 created over all underground infrastructure located
                                                 in private property;
                                                 AND
                                                 S5.3 The width of the easement is the greater of
                                                 3m or the width of the zone of influence;
                                                 AND
                                                 S5.4 The easement is centred over the centreline of
                                                 the infrastructure.

O6 Alignment of water supply infrastructure      S6.1 Infrastructure is designed and constructed on       Not applicable.
allows for easy access for the ongoing           the preferred alignments in accordance with PSP6
maintenance by Council.                          Engineering Design Standards – Water and                 No extension of Council’s water infrastructure is required for the
                                                 Sewerage.                                                proposed development.

O7     Any    alterations    or   repairs  to    S7.1 Any alterations or repair to infrastructure as a    Complies.
infrastructure as a result of the development    result of the development are completed at the
are made at no cost to Council.                  developer’s expense.                                     Any alterations or repairs to infrastructure required as a result of
                                                                                                          works carried out during construction will be carried out at the
                                                                                                          developer’s expense.



Table 14-63 Sewerage Reticulation
14.165 Design and construction (sewer)
O8 Sewerage reticulation infrastructure—         S8.1   Sewerage reticulation    infrastructure is        Not applicable.
a) meets the needs of the users;                 designed in accordance with PSP6 Engineering
b) is designed to be compatible with existing    Design Standards – Water and Sewerage.                   No extension of Council’s sewerage infrastructure is required for the
infrastructure; and                                                                                       proposed development.
c) is designed using materials that are
suitable of the use, durable, easy to maintain
and cost effective, taking into account the
whole of life cycle cost and Council’s
maintenance inventory.

O9 Sewerage reticulation infrastructure is       S9.1   Sewerage     reticulation   infrastructure   is   Not applicable.

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.