Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 78, section 1. The text section number identifies this passage in the reader.
are provided at the following rate:
a) 1 locker per 2 bicycle parking spaces;
and
b) 1 shower cubicle with ancillary change
rooms per 10 bicycle spaces or part thereof;
AND
S31.4 Bicycle parking spaces and cyclist
facilities are designed in accordance with
AUSTROADS Guide to Traffic Engineering
Practice, Part 14 – Bicycles, Section 10;
AND
S31.5 On-site pedestrian facilities such as
seating and shade structures are provided
in developments for the convenience of
persons walking to the site.
Site facilities 32.1 Waste storage areas, external storage Complies.
O32 Waste storage areas, external storage areas and loading docks are situated to the
areas and loading docks do not detract from rear of the building or under the ground; The proposed external storage area and bin storage area have been
the visual amenity of the streetscape or cause OR appropriately located on the subject site in order to optimise the
nuisance to adjoining properties. S32.2 With the exception of the access functionality of the use on the subject site, particularly in respect of vehicle
way, waste storage areas, external storage movements.
areas and loading docks are visually
screened by landscaping or fencing. The proposed landscaping along the northern boundary of the subject site
will provide sufficient visual enhancement to ensure the visual amenity of
the streetscape of the industrial area is not impacted.
Environment & heritage values No solution provided Complies.
O33 There are no significant adverse effects on Advisory note
the biodiversity, natural vegetation, native PSP24 – Effluent Disposal details As shown on the Engineering Plans contained within Appendix D of this
wildlife, habitats, landscape quality, water requirements for the design and siting of report:
quality or heritage values, including those effluent disposal systems where located − all stormwater will be collected and discharged to a legal point of
related to— outside a sewerage service area. discharge, with all stormwater passing through the bio-retention basin
a) changes to natural drainage; Compliance with PSP24 will be considered prior to discharge; and
b) disturbance to any of the wetland systems; as part of Council’s assessment of the − the bin storage area will be bunded to ensure no contaminants come in
c) management of landslide and fire risk; plumbing and drainage application. contact with stormwater.
d) erosion and the transport of sediments off-
site; The proposed development will not result in any significant adverse effects
e) unmanaged public access; on environmental or heritage values.
4
f) effluent disposal ;
g) changes to fauna habitat and behaviour;
and
h) disturbance of buildings and features,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.