Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 97, section 1. The text section number identifies this passage in the reader.

                                             a) temporary or permanent downpipes are
                                             connected to the stormwater system before laying
                                             the roof; or
                                             b) localised erosion is avoided by directing flow from
                                             downpipes over non-erosive areas.

Stormwater runoff                                                                                     Complies.
O2 Stormwater is diverted around disturbed   S2.1 Diversion drains or bunds are designed and
areas                                        constructed to drain upstream run-off around the         Please refer to the Engineering Plans contained within Appendix D of
                                             disturbed site;                                          this report, which detail the erosion and sediment control measures
                                                                                                      intended to be implemented during the construction phase of the
                                             AND                                                      development.

                                             S2.2 Discharge from the diversion drains do not
                                             cause run-off impacts to other properties;

                                             OR

                                             S2.3 Alternative methods, as described in the
                                             Institution of Engineers Australia (Queensland
                                             Division) Soil Erosion and Sediment Control -
                                             Guidelines for Queensland Construction Sites, are
                                             used.

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.