Council archive · source document
Collated Planning Report · MCU14/0077
Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.
Original PDF page 97, section 1. The text section number identifies this passage in the reader.
a) temporary or permanent downpipes are
connected to the stormwater system before laying
the roof; or
b) localised erosion is avoided by directing flow from
downpipes over non-erosive areas.
Stormwater runoff Complies.
O2 Stormwater is diverted around disturbed S2.1 Diversion drains or bunds are designed and
areas constructed to drain upstream run-off around the Please refer to the Engineering Plans contained within Appendix D of
disturbed site; this report, which detail the erosion and sediment control measures
intended to be implemented during the construction phase of the
AND development.
S2.2 Discharge from the diversion drains do not
cause run-off impacts to other properties;
OR
S2.3 Alternative methods, as described in the
Institution of Engineers Australia (Queensland
Division) Soil Erosion and Sediment Control -
Guidelines for Queensland Construction Sites, are
used.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Collated Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.