Skip to the record
For the highest quality transcripts.

Council archive · source document

Collated Planning Report · MCU14/0077

Attached to the e-mail MCU14/0077 & OPW14/0324 Industrial business Type 1 & Retail business Type 4.

of 118

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Original PDF page 98, section 1. The text section number identifies this passage in the reader.

   Application for a Development Permit for Material Change of Use to establish an Industrial Business, Type 1 Warehouse and Retail
 Business, Type 4 Showroom (Trade Related Showroom, Plumbing Supplies) and Operational Works (Stormwater Drainage, Landscaping,
   Car Parking and Access Driveway), on land identified as Lot 10 on SP230643, situated at 10/100 Rene Street, Noosaville Qld 4566


                                                            EXISTING SERVICES CODE
         Specific Outcomes                                  Probable Solutions                            How does the proposal comply with the Overall
                                                                                                               Outcome/s or Specific Outcome/s?
Setbacks and easements                                                                                  Complies.
O1 Development near a sewer, water main,       S1.1 The footing of any structure or building is
stormwater drain, overland flow path or        located clear of the zone of influence but no closer     No building or structure associated with the proposed development
associated structure does not—                 than     1.5m     (measured     horizontally)  from      will be located closer than 1.5m from Council’s infrastructure.
a) adversely affect the function of the        infrastructure including sewers, water mains and
service;                                       stormwater structures;                                   The finished surface level of the subject site will maintain a minimum
b) place an additional load on the service;                                                             of 600mm cover over the underground infrastructure.
and                                            AND
c) unduly increase future maintenance costs.                                                            Any manhole or inspection point, which is disturbed or altered during
                                               S1.2 No building or structure overhangs the zone of      construction will be replaced to match the new surface level.
                                               influence;
                                                                                                        For further details please refer to Appendix D of this report, which
                                               AND                                                      contains Engineering Plans that show the location of existing
                                                                                                        infrastructure as well as the finished surface level of the proposed
                                               S1.3 Finished surface levels maintain a minimum of       development.
                                               600mm of cover, but no greater than 3m of cover to
                                               the underground infrastructure;

                                               AND
                                               S1.4 If the existing surface level is altered, surface
                                               level services including manholes and inspection
                                               points are altered to match the new surface level;

                                               AND
                                               S1.5 Alterations are constructed in accordance
                                               withPSP6 –Engineering Design Standards — Water
                                               and Sewerage and Section 4 of PSP5 –Engineering
                                               Design   Standards   –  Roads,   Drainage  and
                                               Earthworks;

                                               OR

Used in these records

About this file

File size
8.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Collated Planning Report.pdf · 8.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.