Delegated Report - Code - Planning MCU22 0197 [As Published] · MCU22/0197
010 B Driveway Layout Plan 23 February 2023
Prepared by RECOR Consulting
020 B Bulk Earthworks Layout Plan 23 February 2023
Prepared by RECOR Consulting
021 B Earthworks Longitudinal Sections 23 February 2023
Prepared by RECOR Consulting
040 B Stormwater Layout Plan 23 February 2023
Prepared by RECOR Consulting
046 B Stormwater Longitudinal Sections 23 February 2023
Prepared by RECOR Consulting
CURRENCY PERIOD
32. The Currency Period for this development approval lapses if the development has not
substantially started by 15 June 2025, unless an application to extend the currency period is
approved by Council.
Site Specific Conditions
Bonds
33. A site control and/or compliance bond of $5,000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
34. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
35. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
36. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
37. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
38. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
d. Civil engineering works;
Page 16 of 25
Document Set ID: 22435587
Version: 8, Version Date: 15/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0197 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.