Delegated Report - Code - Planning MCU22 0197 [As Published] · MCU22/0197
Car Parking
23. A minimum of 4 covered car parking spaces must be provided on the site. The works must
be undertaken in accordance with the conditions held within this Decision Notice and must
include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Stormwater Drainage
24. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions held within this
Decision Notice and be generally in accordance with:
a. RECOR’s Stormwater Layout Plan (040, Rev. B) dated 23 February 2023; and
b. RECOR’s Stormwater Longitudinal Sections (046, Rev. B) dated 23 February 2023.
Easements
25. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
26. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
27. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
28. All works must be carried out in accordance with the recommendations contained in the site-
specific Geotechnical report prepared by Tectonic (22393-001-Rev0) dated 26 October
2022.
Earthworks and Retaining Walls
29. All fill and associated batters must be undertaken in accordance with the conditions held
within this Decision Notice, be contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council and be generally in
accordance with:
a. RECOR’s Bulk Earthworks Layout Plan (020, Rev. B) dated 23 February 2023; and
b. RECOR’s Earthworks Longitudinal Sections (021, Rev. B) dated 23 February 2023.
30. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
OPERATIONAL WORKS
APPROVED PLANS
31. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Page 15 of 25
Document Set ID: 22435587
Version: 8, Version Date: 15/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU22 0197 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.