1 - GEOTECHNICAL INVESTIGATION REPORT - 150320 LAR Road Investigation Ridgewood Geotech 23042015_Rev1-Combined
Very large file: it may take a few minutes
The original of this document is very large (24.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
4. 1 Auger Holes A series of auger holes were drilled at approximately 200 m centres along the length of the proposed road upgrade. Seven auger holes were drilled in total through the existing pavement gravels into the underlying subgrade. The auger hole locations were recorded using a hand held GPS unit using the WGS84 coordinate system. The locations of the auger holes are provided below: • AH15-01 - 486366E; 7074117N - Auger hole located 2 m inside southern edge • AH15-02 - 486184E; 7074129N - Auger hole located 1.5 m inside northern edge • AH15-03 - 486014E; 7074020N - Auger hole located 1.5 m inside western edge • AH15-04 - 485872E; 7073861N - Auger hole located 1.1 m inside eastern edge • AH15-05 - 485841E; 7073708N - Auger hole located 1.8 m inside western edge • AH15-06 - 485713E; 7073520N - Auger hole located 1.2 m inside northern edge • AH15-07 - 485533E; 7073491N - Auger hole located 1.8 m inside southern edge Samples were taken of selected pavement materials and subgrade soils for potential use in laboratory testing. Dynamic Cone Penetrometer (DCP) testing was undertaken at selected auger hole locations to aid in soil strength characterisation. All auger hole drilling was carried out under the direction of a senior geotechnical engineer and traffic controllers working to a council approved traffic management scheme. The termination depth of auger holes ranged between 0.15 m (AH15-07) and 1.5 m (AH15-2 to AH15-4 and AH15-06). On completion of logging and sampling, all auger holes were backfilled in lightly tamped layers using spoil and Type 2.1 gravel mixed with a small amount cement binder. The auger hole at road surface was compacted using a flat plate fixed to the end of a crowbar and cleaned as best as possible of any remaining materials before the road section was again opened to traffic. Auger hole logs are presented in Appendix A and geotechnical terms and symbols are presented in Appendix B. 4. 2 Existing Cut Batters The second activity comprised a walkover inspection and stability assessment of existing road cuts at locations where road widening is proposed. The majority of proposed widenings have little or no impact on the existing cut slopes. However there are three locations along the existing road where re-profiling of cut batters will be required. The major section is from approximately CH1080 to CH1280 (refer drawing REE-TFR-GT-002), with a shorter section at the beginning of Top Forestry Road near the junction with Old Ceylon Road (refer drawing REE-TFR-GT-005) and a short section south of the junction with King Parrot Lane (refer drawing REE-TFR-GT-004). The walkover inspection was undertaken by an experienced engineering geologist to assess the condition and geology of the existing batters. The bedrock exposed in the cuttings was from the Kin Kin Beds and comprised argillite, phylitte (a low grade metamorphic rock) and arenite. It exhibited foliated bedding, and was present as low to medium strength rock, becoming extremely low strength in places due to variable weathering, overlain by approximately 1 m of residual soil. The walkover inspection was undertaken on 1 April 2015 and the existing cut sections were inspected, photographs, and measurements taken of average slope angles and heights. The inspection photographs are designated Plates 1 to 38, and are divided into three sections to File: 150320 LAR Road Investigation Ridgewood Geotech 23042015_Rev1 Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.