Table 1: Calculated Hydraulic Wastewater Flows from DEHP (formerly DNR&M)
Daily Sewage
Rooms per Total Daily Sewage Adopted Total
Item Source Quantity Flow per Room
Structure Flow (L/day) Flow (L/day)
(L/day)
1 Bungalow(s) 3 2 300 – 6001 900 – 1 800 1,350
2 Long House 1 4 225 – 4502 900 – 1 800 900
Onsite
3 Caretaker’s 1 1 225 – 4502 225 – 450 225
Residence (Two
Resident Staff)
Additional Staff
4 Accommodation 1 1 225 – 4502 225 – 450 225
(Two Staff
Members)
Total (L/day) 2,700
Note: 1Flow per person based on two (2) bedroom Apartment/Home Unit with reticulated water supply
2Flow per person based on one (1) bedroom Apartment/Home Unit with reticulated water supply
The hydraulic loading associated with the non-resident staff population can be
most reliably calculated using the DEHP (formerly DNR&M) Determining
Capacity of Sewage Treatment Plants Based on Use Conditions, as follows:
Table 2: Calculated Hydraulic Wastewater Flows from DEHP (formerly DNR&M)
Total Daily Sewage Flow
Item Source Population Flows (L/day/pp)
(L/day)
Non-Resident Staff
1 Member (E.g. General 1 301 30
Manager)
Non-Resident
2 Cleaning Staff 2 15 30
Members
Total (L/day) 60
1Flow per person based on Non-Resident Staff at Hotels/Motels type facility
Based on the above references, a total hydraulic loading of 2,760 litres per day
(14EP) can be estimated for the guest and staff accommodation
facilities/population at the Makepeace Island accommodation facility.
On-Site Wastewater Land Application Area
Effluent irrigation currently occurs via subsurface dripper lines within the existing
raised garden beds, totalling 540m2.
Based on the estimated hydraulic loading of 2,760L/day, the required effluent
irrigation area can be determined using Design Irrigation Rate (DIR) calculation
as set out in Table M1 of AS1547:2012.
p: 07 5450 2688 e: [email protected] PO Box 1250, Buddina Q 4575
f: 07 5450 2686 www.future-plus.com.au ABN 23 658 506 336
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Civil Engineering Onsite Effluent AssessmentRelated documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.