Original source · versioned page text
09-02-23 Operational Management and Maintenance Plan_Issue B
Plans and drawings: the text below has words only, no drawings.
FORM C — BIORETENTION MEDIA (CONT.) INSTALLATION OF BIORETENTION MEDIA Base of system free from debris Drainage layer (fine gravel) installed to correct depth (+25 mm) Transition layer (coarse sand) installed to correct depth (+25 mm) Placement of filter media completed to avoid compaction of media and using at least two lifts Filter media installed to correct depth ACTION (IF SATISERCTORY, UNSATISFACTORY) INITIAL Light, even compaction applied to remove air gaps (e.g. light roller or single pass with a ‘pozitrack’ bobcat) Spreader bar used to flatten surface of filter media Sediment fences in place INSPECTION: Superintendent and bioretention designer inspection and sign-off to occur while installation of media is occurring. Photos must be taken by the superintendent, the bioretention designer or the contractor. Comments (attach and refer to additional pages if necessary) NB: Laboratory test results, certification, delivery dockets and photos attached Signed by superintendent: Print name: Date: Signed by bioretention designer: Print name: Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.