Skip to the record
For the highest quality transcripts.

Original source · versioned page text

09-02-23 Operational Management and Maintenance Plan_Issue B

of 29

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
FORM C — BIORETENTION MEDIA (CONT.)

INSTALLATION OF BIORETENTION MEDIA

Base of system free from debris

Drainage layer (fine gravel) installed to
correct depth (+25 mm)

Transition layer (coarse sand) installed to
correct depth (+25 mm)

Placement of filter media completed to
avoid compaction of media and using at
least two lifts

Filter media installed to correct depth

ACTION (IF

SATISERCTORY, UNSATISFACTORY)

INITIAL

 

Light, even compaction applied to
remove air gaps (e.g. light roller or single
pass with a ‘pozitrack’ bobcat)

Spreader bar used to flatten surface of
filter media

 

 

Sediment fences in place

 

 

INSPECTION: Superintendent and bioretention designer inspection and sign-off to occur while installation of media is

occurring. Photos must be taken by the superintendent, the bioretention designer or the contractor.

Comments (attach and refer to additional pages if necessary)

NB: Laboratory test results, certification, delivery dockets and photos attached

Signed by superintendent:
Print name:

Date:

Signed by bioretention designer:
Print name:

Date:

 
Log in to download the original file

09-02-23 Operational Management and Maintenance Plan_Issue B.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.