Original source · versioned page text
09-02-23 Operational Management and Maintenance Plan_Issue B
Plans and drawings: the text below has words only, no drawings.
FORM D — FINISHED LEVELS Purpose: To ensure finished levels of system surface and bunds are correct and meet the design. ACTION (IF ITEMS CHECKED SATISFACTORY UNSATISFACTORY) INITIAL | Landscaping topsoil applied to | surrounding bunds to achieve design levels As-constructed survey of system surface | and surrounding bunds completed Final constructed levels are consistent with design levels Under-drainage clean-outs extended 50- 150 mm above filter media Under-drainage pipes flushed to remove initial ingress of material HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached Signed by superintendent: Signed by bioretention designer: Print name: Print name: Date: Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.