Original source · versioned page text
Info Request MCU16/0153
MCU16/0153 details. Building constructions details shall be confirmed for all building envelope constructions. Copies of calculations are to be provided for review by Council. 16. Similarly, maximum noise levels recorded prior to 7am shall be used to demonstrate compliance with sleep disturbance criteria in bedrooms for short duration noise events emanating from activities on the shopping village site prior to 7am and after 10pm. Building envelope noise intrusion calculations for maximum noise levels to demonstrate compliance with the sleep disturbance criteria shall be provided for review by Council (as for item 3 above). Issue - Noise Monitoring of Peregian Hotel The acoustic report has not referenced the hotel license, or the unreasonable noise criteria, or Council conditions in its assessment of the noise impact of the hotel approval conditions and operations upon the proposed development, in particular, the linea houses along the eastern boundary of the development site. Information Required 17. A detailed report of the hotel noise emissions having regard to the License, OLGR unreasonable noise criteria and Council conditions. The report is to indicate the noise mitigation plan required for the hotel to achieve compliance with all of the relevant criteria and development conditions, assuming that the proposed residential development is approved. The detailed report is to be based on source noise levels measured at the Peregian Beach hotel site. The noise mitigation plan is to be agreed between the hotel and the developer with a formal commitment by each party to implement the plan prior to commencement of construction of the proposed development if it is approved by Council. The implementation of the plan is to be certified by a suitably qualified and independent acoustic consultant. The detailed report is to confirm that the hotel building envelope, including windows, will achieve compliance with the unreasonable noise criteria when windows are closed, given the internal source levels stated in the License. The detailed report is to include consideration of all noise sources associated with the hotel operations on the site. Issue - Noise Monitoring of Peregian Hotel The acoustic report recommends upgrades to the building envelope constructions of the linea houses. The report does not state whether the recommendation includes both levels of the houses or only the upper level, or only some of the upper level constructions, or upper level constructions for all of the houses. Information Required 18. Following preparation of the detailed report for the hotel noise emissions, the building envelope sound transmission loss specifications for the linea houses is to be confirmed. The acoustic specification of the building envelope constructions is to include sketches showing the construction details of glazing, walls and roof-ceilings for each bedroom and living areas affected by the hotel noise emissions. The Page 5 of 13 Document Set ID: 20272939 Version: 3, Version Date: 10/02/2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.