4.2.3 XP Storm and Rational Method Comparison
Before utilising data from XP storm, a comparison of results from XP Storm and the Rational Method was undertaken to
ensure that the XP Storm model was functioning correctly. Peak discharge rates from the site in the existing case were
compared (“site” catchments defined in Table 6). The comparison was undertaken for the Lot 3 catchment only outlined in
Table 10. Detailed Rational Method calculations can be reviewed in Appendix D.
Table 10: Comparison of Rational Method & XP Storm Existing Peak Flows – Lot 3 (m3/sec)
AEP (%) ARI (Years) Rational Method Result XP Storm Result % Difference
63.21 1 0.152 0.104 -31.38
39.35 2 0.184 0.139 -24.38
18.13 5 0.286 0.255 -10.74
10 10 0.358 0.341 -4.87
5 20 0.436 0.433 -0.70
2 50 0.565 0.548 -3.01
1 100 0.660 0.648 -1.82
As indicated, the XP Storm peak discharge results are of the same magnitude as the results initially estimated using the
Rational Method. It was therefore concluded that the existing XP Storm model was functioning correctly.
4.2.4 Developed Scenario Model
A developed scenario model was then created with internal catchments and parameters modified from the existing model
to suit the proposed development as outline in Table 11, 12 and 13.
Table 11: XP Storm Developed Model Parameters – Lot 3
Parameter Lot 3 Catchment
Pervious Data Impervious Data
Area (ha) 0.209 2.770
Slope (%) 2.0 2.0
Mannings ‘n’ 0.03 0.013
Initial Loss (mm) 27 0
Continuing Loss (mm/hr) 2.6 0
Laurenson ‘n’ -0.285 -0.285
Table 12: XP Storm Developed Model Parameters – Lot 7 (North)
Parameter Lot 7 Northern Catchment
Pervious Data Impervious Data
Area (ha) 0.025 0.224
Slope (%) 2.5 2.5
Mannings ‘n’ 0.03 0.015
Initial Loss (mm) 27 0
Continuing Loss (mm/hr) 2.6 0
Laurenson ‘n’ -0.285 -0.285
www.bornhorstward.com.au Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.