Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

BORNHORST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

+\VARD
Table 7: XP Storm Existing Peak Flow Results — Lot 3 (m?/sec)
Storm Duration ARI & AEP
. 1 Years | 2 Years | 5 Years | 10 Years 20 Years | 50 Years | 100 Years
(min) 63% 39% 18% 10% 5% 2% 1%
20 0.005 0.014 0.049 0.077 0.113 0.139 0.187
25 0.012 0.021 0.058 0.090 0.123 0.172 0.218
30 0.014 0.032 0.075 0.111 0.150 0.209 0.263
45 0.031 0.049 0.119 0.168 0.227 0.311 0.392
60 0.048 0.067 0.153 0.215 0.295 0.391 0.480
90 0.072 0.099 0.209 0.293 0.375 0.497 0.591
120 0.090 0.125 0.238 0.326 0.413 0.535 0.634
180 0.104 0.139 0.255 0.341 0.433 0.548 0.648
Critical 0.104 0.139 0.255 0.341 0.433 0.548 0.648
Critical Even (Min) 180 180 180 180 180 180 180
Table 8: XP Storm Existing Peak Flow Results - Lot 7 (North) (m3/sec)
Storm Duration ARI & AEP
. 1 Years | 2 Years | 5 Years | 10 Years 20 Years | 50 Years | 100 Years
(min) 63% | 39% | 18% 10% 5% 2% 1%
20 0.001 0.003 0.010 0.017 0.024 0.030 0.040
25 0.002 0.004 0.012 0.019 0.026 0.037 0.047
30 0.003 0.007 0.016 0.024 0.032 0.044 0.056
45 0.007 0.010 0.025 0.035 0.046 0.061 0.074
60 0.010 0.014 0.029 0.040 0.053 0.068 0.082
90 0.013 0.018 0.033 0.046 0.058 0.073 0.086
120 0.014 0.019 0.035 0.047 0.059 0.071 0.084
180 0.014 0.019 0.034 0.046 0.058 0.070 0.082
Critical 0.014 0.019 0.035 0.047 0.059 0.073 0.086
Critical Even (Min) 120 120 120 120 120 90 90
Table 9: XP Storm Existing Peak Flow Results - Lot 7 (South) (m3/sec)
Storm Duration ARI & AEP
(min) 1Years | 2 Years | 5Years | 10 Years | 20 Years | 50 Years | 100 Years
63% 39% 18% 10% 5% 2% 1%
20 0.001 0.003 0.011 0.018 0.026 0.032 0.043
25 0.003 0.005 0.013 0.021 0.029 0.040 0.051
30 0.003 0.007 0.017 0.026 0.035 0.048 0.061
45 0.007 0.011 0.027 0.039 0.051 0.070 0.086
60 0.011 0.015 0.034 0.046 0.061 0.079 0.095
90 0.015 0.021 0.040 0.054 0.068 0.086 0.102
120 0.017 0.023 0.042 0.056 0.071 0.087 0.102
180 0.017 0.023 0.042 0.056 0.071 0.085 0.100
Critical 0.017 0.023 0.042 0.056 0.071 0.087 0.102
Critical Even (Min) 120 120 120 120 120 120 90

 

 

 

 

 

 

 

 

 

 

Discharge hydrographs for the existing model have been included in Appendix F.

www.bornhorstward.com.au Page 9

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.