Table 21: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 3 (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.104 0.102 -0.002
2 0.139 0.132 -0.007
5 0.255 0.220 -0.035
10 0.341 0.327 -0.014
20 0.433 0.373 -0.060
50 0.548 0.481 -0.067
100 0.648 0.628 -0.020
Table 22: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 7 (North) (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.014 0.013 -0.001
2 0.019 0.015 -0.004
5 0.035 0.019 -0.016
10 0.047 0.025 -0.022
20 0.059 0.035 -0.024
50 0.073 0.053 -0.020
100 0.086 0.082 -0.004
Table 23: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 7 (South) (m3/sec)
ARI (Years) Existing Critical Discharge Developed Critical Discharge Discharge Difference
1 0.017 0.017 0.000
2 0.023 0.018 -0.005
5 0.042 0.023 -0.019
10 0.056 0.036 -0.020
20 0.071 0.047 -0.024
50 0.087 0.065 -0.022
100 0.102 0.098 -0.004
www.bornhorstward.com.au Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.