Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 18, section 1. The text section number identifies this passage in the reader.
Table 19: XP Storm Developed Mitigated Peak Flow Results – Lot 7 (North) (m3/sec)
Storm Duration ARI (Years)
(min) 1 2 5 10 20 50 100
20 0.011 0.012 0.014 0.016 0.017 0.019 0.020
25 0.011 0.013 0.015 0.017 0.018 0.020 0.023
30 0.012 0.013 0.016 0.018 0.019 0.022 0.031
45 0.013 0.014 0.017 0.019 0.021 0.036 0.055
60 0.013 0.014 0.018 0.020 0.028 0.043 0.066
90 0.013 0.015 0.019 0.021 0.033 0.053 0.073
120 0.013 0.015 0.019 0.024 0.035 0.052 0.069
180 0.013 0.015 0.019 0.025 0.035 0.048 0.082
Critical 0.013 0.015 0.019 0.025 0.035 0.053 0.082
Critical Event 45 90 90 180 120 90 180
Table 20: XP Storm Developed Mitigated Peak Flow Results – Lot 7 (North) (m3/sec)
Storm Duration ARI (Years)
(min) 1 2 5 10 20 50 100
20 0.013 0.014 0.017 0.019 0.021 0.023 0.026
25 0.014 0.015 0.018 0.020 0.022 0.026 0.036
30 0.014 0.016 0.019 0.021 0.023 0.034 0.043
45 0.016 0.017 0.021 0.023 0.034 0.047 0.064
60 0.016 0.018 0.022 0.027 0.040 0.052 0.080
90 0.016 0.018 0.023 0.033 0.044 0.064 0.091
120 0.017 0.018 0.023 0.036 0.046 0.065 0.089
180 0.016 0.018 0.023 0.036 0.047 0.062 0.098
Critical 0.017 0.018 0.023 0.036 0.047 0.065 0.098
Critical Event 120 60 90 120 180 120 180
4.2.8 Hydraulic Impacts on Downstream Waterway Corridor
A comparison of critical peak flows for the existing and developed mitigated scenarios has been included in Table 21, 22
and 23. The hydraulic modelling undertaken has demonstrated that the proposed development will not cause a worsening
impact downstream of the site in all storm events and that the detention has been adequately sized. Therefore, the
required detention volume for all three catchments across the development in the 1% AEP storm event is 3,377m3.
Note that 949m3 of this volume is provided within the three bio-retention basins across each of the three basins, with the
remainder of this volume provided in below-ground detention tanks.
Discharge hydrographs, stage/water elevations for the detention basin and associated XP Storm outputs have been
included in Appendix F of this report to demonstrate the performance of the proposed detention system.
www.bornhorstward.com.au Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.