Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
CONTENTS
1. INTRODUCTION ............................................................................................................................................................................. 1
2. SITE CHARACTERISTICS ................................................................................................................................................................ 1
2.1 LOCATION AND EXISTING FEATURES ........................................................................................................................................ 1
2.2 PROPOSED DEVELOPMENT .......................................................................................................................................................... 2
2.3 TOPOGRAPHY AND CATCHMENT CHARACTERISTICS ............................................................................................................ 3
2.3.1 Lot 3 – Western Lot ........................................................................................................................................................ 3
2.3.2 Lot 7 – Eastern Lot .......................................................................................................................................................... 3
2.4 EXISTING FLOODING CONDITIONS ............................................................................................................................................ 3
3. EXISTING AND PROPOSED STORMWATER INFRASTRUCTURE .............................................................................................. 4
3.1 EXISTING INFRASTRUCTURE ....................................................................................................................................................... 4
3.2 PROPOSED STORMWATER DRAINAGE ...................................................................................................................................... 5
4. STORMWATER QUANTITY ANALYSIS ........................................................................................................................................ 5
4.1 EXISTING NATURAL DRAINAGE CHANNEL FLOOD ASSESSMENT – XP STORM .................................................................. 6
4.1.1 Flood Assessment – Existing Scenario ......................................................................................................................... 6
4.1.2 Flood Assessment – Developed Scenario .................................................................................................................... 7
4.2 DETAILED HYDRAULIC MODELLING – XP STORM – DETENTION SIZING.............................................................................. 8
4.2.1 Existing Scenario Model ................................................................................................................................................ 8
4.2.2 Results for Existing Scenario ........................................................................................................................................ 8
4.2.3 XP Storm and Rational Method Comparison ...........................................................................................................10
4.2.4 Developed Scenario Model .........................................................................................................................................10
4.2.5 Results for Developed Unmitigated Scenario ..........................................................................................................11
4.2.6 Detention Basin Design ...............................................................................................................................................12
4.2.7 Results for Developed Scenario .................................................................................................................................13
4.2.8 Hydraulic Impacts on Downstream Waterway Corridor .........................................................................................14
5. STORMWATER QUALITY ............................................................................................................................................................16
5.1 CONSTRUCTION PHASE .............................................................................................................................................................16
5.2 OPERATIONAL PHASE.................................................................................................................................................................16
5.2.1 Pollutants of Concern ..................................................................................................................................................16
5.2.2 Modelling/Assessment Approach ..............................................................................................................................16
5.2.3 Meteorological Data ....................................................................................................................................................16
5.2.4 Source Nodes ................................................................................................................................................................17
5.2.5 Treatment Methodology .............................................................................................................................................17
5.2.6 Treatment Nodes .........................................................................................................................................................18
5.2.7 Proposed Treatment Train ..........................................................................................................................................19
5.2.8 Results............................................................................................................................................................................19
6. NOOSA SHIRE COUNCIL CODES ................................................................................................................................................20
7. SUMMARY ....................................................................................................................................................................................20
www.bornhorstward.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.