Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

CONTENTS

1.     INTRODUCTION ............................................................................................................................................................................. 1

2.     SITE CHARACTERISTICS ................................................................................................................................................................ 1
2.1 LOCATION AND EXISTING FEATURES ........................................................................................................................................ 1
2.2 PROPOSED DEVELOPMENT .......................................................................................................................................................... 2
2.3 TOPOGRAPHY AND CATCHMENT CHARACTERISTICS ............................................................................................................ 3
       2.3.1         Lot 3 – Western Lot ........................................................................................................................................................ 3
       2.3.2         Lot 7 – Eastern Lot .......................................................................................................................................................... 3
2.4 EXISTING FLOODING CONDITIONS ............................................................................................................................................ 3

3.     EXISTING AND PROPOSED STORMWATER INFRASTRUCTURE .............................................................................................. 4
3.1 EXISTING INFRASTRUCTURE ....................................................................................................................................................... 4
3.2 PROPOSED STORMWATER DRAINAGE ...................................................................................................................................... 5

4.     STORMWATER QUANTITY ANALYSIS ........................................................................................................................................ 5
4.1 EXISTING NATURAL DRAINAGE CHANNEL FLOOD ASSESSMENT – XP STORM .................................................................. 6
       4.1.1         Flood Assessment – Existing Scenario ......................................................................................................................... 6
       4.1.2         Flood Assessment – Developed Scenario .................................................................................................................... 7
4.2 DETAILED HYDRAULIC MODELLING – XP STORM – DETENTION SIZING.............................................................................. 8
       4.2.1         Existing Scenario Model ................................................................................................................................................ 8
       4.2.2         Results for Existing Scenario ........................................................................................................................................ 8
       4.2.3         XP Storm and Rational Method Comparison ...........................................................................................................10
       4.2.4         Developed Scenario Model .........................................................................................................................................10
       4.2.5         Results for Developed Unmitigated Scenario ..........................................................................................................11
       4.2.6         Detention Basin Design ...............................................................................................................................................12
       4.2.7         Results for Developed Scenario .................................................................................................................................13
       4.2.8         Hydraulic Impacts on Downstream Waterway Corridor .........................................................................................14

5.     STORMWATER QUALITY ............................................................................................................................................................16
5.1 CONSTRUCTION PHASE .............................................................................................................................................................16
5.2 OPERATIONAL PHASE.................................................................................................................................................................16
       5.2.1         Pollutants of Concern ..................................................................................................................................................16
       5.2.2         Modelling/Assessment Approach ..............................................................................................................................16
       5.2.3         Meteorological Data ....................................................................................................................................................16
       5.2.4         Source Nodes ................................................................................................................................................................17
       5.2.5         Treatment Methodology .............................................................................................................................................17
       5.2.6         Treatment Nodes .........................................................................................................................................................18
       5.2.7         Proposed Treatment Train ..........................................................................................................................................19
       5.2.8         Results............................................................................................................................................................................19

6.     NOOSA SHIRE COUNCIL CODES ................................................................................................................................................20

7.     SUMMARY ....................................................................................................................................................................................20




                                                                              www.bornhorstward.com.au

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.