Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
LIST OF FIGURES
Figure 1: Site Locality Plan ................................................................................................................................................................................................................... 2
Figure 2: Noosa Shire Council Interactive Flood Map ............................................................................................................................................................. 4
Figure 3: Proposed Treatment Train (Entire Development) ................................................................................................................................................ 19
LIST OF TABLES
Table 1: IFD Parameters ........................................................................................................................................................................................................................ 6
Table 2: XP Storm Existing Catchment Model Parameters .................................................................................................................................................... 6
Table 3: Existing Scenario Critical Peak Flow Runoff (m3/s)................................................................................................................................................... 7
Table 4: XP Storm Developed Catchment Model Parameters .............................................................................................................................................. 7
Table 5: Developed Scenario Critical Peak Flow Runoff (m3/s) ............................................................................................................................................ 8
Table 6: XP Storm Existing Model Parameters ............................................................................................................................................................................ 8
Table 7: XP Storm Existing Peak Flow Results – Lot 3 (m3/sec) ............................................................................................................................................ 9
Table 8: XP Storm Existing Peak Flow Results – Lot 7 (North) (m3/sec) ........................................................................................................................... 9
Table 9: XP Storm Existing Peak Flow Results – Lot 7 (South) (m3/sec) ........................................................................................................................... 9
Table 10: Comparison of Rational Method & XP Storm Existing Peak Flows – Lot 3 (m3/sec)........................................................................... 10
Table 11: XP Storm Developed Model Parameters – Lot 3 ................................................................................................................................................. 10
Table 12: XP Storm Developed Model Parameters – Lot 7 (North) ................................................................................................................................ 10
Table 13: XP Storm Developed Model Parameters – Lot 7 (South) ................................................................................................................................ 11
Table 14: XP Storm Developed Unmitigated Peak Flow Results – Lot 3 (m3/sec)..................................................................................................... 11
Table 15: XP Storm Developed Unmitigated Peak Flow Results – Lot 7 (North) (m3/sec).................................................................................... 11
Table 16: XP Storm Developed Unmitigated Peak Flow Results – Lot 7 (South) (m3/sec).................................................................................... 12
Table 17: XP Storm Developed Model Hydraulic Routing .................................................................................................................................................. 12
Table 18: XP Storm Developed Mitigated Peak Flow Results – Lot 3 (m3/sec).......................................................................................................... 13
Table 19: XP Storm Developed Mitigated Peak Flow Results – Lot 7 (North) (m3/sec) ......................................................................................... 14
Table 20: XP Storm Developed Mitigated Peak Flow Results – Lot 7 (North) (m3/sec) ......................................................................................... 14
Table 21: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 3 (m3/sec) .......................................................... 15
Table 22: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 7 (North) (m3/sec) .......................................... 15
Table 23: XP Storm Existing and Developed Mitigated Peak Discharge Comparison – Lot 7 (South) (m3/sec) .......................................... 15
Table 24: Noosa Shire Council Water Quality Objectives .................................................................................................................................................... 16
Table 25: Source Node Information – Lot 3 Catchment ...................................................................................................................................................... 17
Table 26: Source Node Information – Lot 7 Northern Catchment .................................................................................................................................. 17
Table 27: Source Node Information – Lot 7 Southern Catchment .................................................................................................................................. 17
Table 28: Selected Stormwater Quality Treatment Devices................................................................................................................................................ 18
Table 29: Pollutant Removal Rates Discharge (Entire Development) ............................................................................................................................. 19
APPENDICES
Appendix A DEVELOPMENT DRAWINGS
Appendix B ENGINEERING DRAWINGS
Appendix C EXISTING STORMWATER AND CONTOUR INFORMATION
Appendix D RATIONAL METHOD CALCULATIONS
Appendix E XP STORM FLOOD ASSESSMENT OUTPUTS
Appendix F XP STORM 1D DETENTION SIZING OUTPUTS
Appendix G MUSIC DATA
Appendix H COUNCIL CODES
www.bornhorstward.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.